Vulcan-Hart MHB24G, VHX24G5 manual General, Installation, Maintenance Cleaning Introduction

Page 4

VHX SERIES STEAMERS - GENERAL

GENERAL

INSTALLATION

Model Designations

Refer to the Installation and Operation Manual for detailed installation instructions.

MAINTENANCE

Refer to the Installation and Operation Manual for specific maintenance instructions.

CLEANING

Refer to the Installation and Operation Manual for specific cleaning instructions.

INTRODUCTION

Steam Cooking

Convection cooking in pressure-less steaming compartments will steam cook fresh foods or will steam defrost and cook frozen foods providing the maximum color, flavor and nutritional value with the least expenditure of energy and labor. The pressure- less steaming compartments on the VHX series allows the operator to open and close the door, anytime during a cooking cycle. The steam supply will shut off when the door is opened, then re-start when the door is closed.

Compartment Pan Capacity

 

NUMBER OF PANS

PAN

MODEL

DEPTH

PER COMPARTMENT

 

(INCHES)

 

 

 

 

 

 

2

4.0

 

 

 

VHX24G

3

2.5

 

 

 

 

6

1.0

 

 

 

 

3

4.0

 

 

 

VHX24G5

5

2.5

 

 

 

 

10

1.0

 

 

 

 

Pan Size 12" x 20"

 

 

 

 

Boiler Code Descriptions

Vulcan-Hart incorporates redundant controls in compliance with the CSD-1 controls and safety devices for boiler construction on these High Efficiency Steam models. A Description of the code is listed below.

CSD-1 Construction - Redundant controls in the electrical safety circuits that, if tripped, must manually be reset after the condition causing the trip subsides. These controls consist of - (1) dual function water level cycling and low level cut off control and (1) single function low water level cut-off control (Aux LLCO) and a high pressure relief switch in conjunction with a mechanical pressure relief valve. Additionally, both circuits have individual indicator lights for low water and high pressure that will illuminate for a visual verification of the shutdown mode.

CSD-1 construction requires operator intervention in the event of a shutdown. The indicator lights show the operator which safety system was shutdown.

F24700 (October 2001)

 

Page 4 of 68

 

Image 4 Contents
VHX Boiler Base Series High Efficiency GAS Steamers VHX24G ShownTable of Contents VHX Series Steamers Maintenance Cleaning Introduction InstallationGeneral Boiler Control Styles Water Conditioning Specifications SystemWater Supply ElectricalTools Gas SupplyStandard SpecialSteamer Operation Cabinet Base BoilerCooking Compartment Controls VHX Series Steamers OperationBoiler Blowdown Steamer Shut OFF Component Function VHX Series Steamers Component FunctionBlowdown/Drain Ignition Control ModuleSteam Header Assembly Water LevelWater Inlet Valve manual Pressure Relief ValveCompartment Pressure Switch Steam Solenoid ValveManifold Pressure Gauge Steam Supply ManifoldRemoval and Replacement of Parts VHX Series Steamers Removal and Replacement of PartsComponent Locations Cabinet Base Boiler ControlsCabinet Base Boiler Controls Relay Board Water Level Controls Main or Auxiliary LlcoCooking Compartment Controls Pressure Switches Water Level Gauge AssemblyBoiler Assembly Pilot GAS Valve Main GAS Valve Boiler Fill and Cold Water Condenser Solenoid ValvesBurner Head Assembly Complete Burner AssemblyHeat Exchanger VHX Series Steamers Removal and Replacement of Parts Removal Cooking Compartment DoorsGasket Latch Assembly HandleService Procedures and Adjustments Clean-OutBoiler InspectionWater Level Probe Housing Blowdown Descaler Cathodic ProtectorWater Level Controls TestAuxiliary Low level Cut-Off Control High Limit CyclingFill and Cold Water Solenoid Valves Small incrementsInline Water Strainer Cleaning Boiler BLOWDOWN/DRAIN Solenoid ValvePressure Switch Adjustment Main Burner Ignition ChecksGAS Manifold Pressure Adjustment VHX Series Steamer Service Procedures and Adjustments AIR Pressure Switch Adjustment GAS Pilot Pressure Adjustment Pressure Readings Inches W.C GAS Manifold Pressure Adjustment Ignition Control Module Checks TerminalsSpark Verification Test Intake Shut-Off Valve Adjustment Steam Flow Door Sealing AdjustmentCooking Compartment Cooking Compartment DoorsDoor Latch Adjustment VHX Series Steamer Electrical OperationElectrical Operation Low Level Cut-Off & Differential ControlAuxiliary Low Level Cut-Off Board Layout and LED Legend LED LegendBoiler Operational Status LED Indicator Reset Engaged State CInitial Conditions State a Aux Water Level Satisfied State BAir Pressure Switch Satisfied State D K32 CloseK51 Close Burner ON, Boiler Heating to generate steam State ESequence of Operation NEW Style Controls BoilerInitial Fill and Preheat HL-LEDN9, N10, N11, N12, N13 go out N14, N16, N17 go outWater Refill After Initial Fill Boiler Blowdown/drainVHX Series Steamer Electrical Operation Cooking Compartment Controls This page Intentionally Left Blank Schematics Models Built After 5/25/00 New Style Boiler ControlsVHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls Cooking Compartment Controls Wiring Diagrams VHX Series Steamer Electrical Operation Models Built Before 5/25/00 Old Style Boiler Controls VHX Series Steamer Electrical Operation Cooking Compartment Controls VHX Series Steamer Troubleshooting TroubleshootingBoiler Base Controls Symptom Possible Causes Adjustments Boiler blowdown solenoid valve clogged and not fully closing Boiler Base Procedures and Adjustments VHX Series Steamer VHX Series Steamer Condensed Spare Parts List Condensed Spare Parts ListNEW Style Controls only VHX24G, VHX24G5, MHB24G