Trane CVHE-SVU01E-ENX39640712050 manual Proper Water Treatment, Recovery and Recycle Connections

Page 96

Maintenance

Recovery and Recycle

Connections

To facilitate refrigerant removal and replacement, newer-design CVHE, CVHF and CVHG units are provided with a 3/4-inch vapor fitting with shutoff valve on the chiller suction and with a 3/4-inch liquid connection with shutoff valve at the bottom of the evaporator shell. (Refer to Refrigerant Handling Guidelines.)

Leak Testing

To leak-test a chiller containing full refrigerant charge, raise chiller pressure using a controlled hot water or electric-resistance system to a maximum of 8 psig. Do not use nitrogen, which will cause excessive refrigerant discharge by the purge system.

Cleaning the Condenser

CAUTION

Proper Water Treatment!

The use of untreated or improperly treated water in a CenTraVac may result in scaling, erosion, corrosion, algae or slime. It is recommended that the services of a qualified water treatment specialist be engaged to determine what water treatment, if any, is required. Trane assumes no responsibility for equipment failures which result from untreated or improperly treated water, or saline or brackish water.

See Figure 34 which shows a Typical Chemical Cleaning Setup.

Figure 34 - Typical Chemical Cleaning Setup

96

CVHE-SVU01E-EN

Image 96
Contents Operation Maintenance Read these carefully Contents General Information Literature changeAbout this manual Unit NameplateCVHF091NAL00ACU2758W7E8TB C0000000K01G14C10W1A03B1Commonly Used Acronyms Control Optional PackagesOverview CvhfGeneral Information General Information Cooling Cycle Cvhf CompressorCVHE, Cvhg pressure enthalpy curve Cvhf pressure enthalpy curve TechView Chiller Service Tool DynaView Human InterfaceCVHE, CVHF, and Cvhg sequence of operation running General Information Surface Temperatures Oil and Refrigeration PumpOil refrigerant pump Base Loading Control Algorithm 20 100 percent RLAGeneral Information Ice Machine Control Free Cooling Cycle Free Cooling Frcl Hot Gas Bypass Hot Water control Heat Recovery Cycle Auxiliary CondensersUnit Control Panel UCP Control Panel Devices and Unit Mounted DevicesUnit Control Panel UCP Variable water flow through the evaporator User-defined language supportOperator Interface DynaView main processorOperator Interface Chiller Stop Prevention/Inhibit Feature How It WorksTop Level Mode Description System Reset MinsecReference Main Screen Diagnostic Screen Back button provides navigation back to the chiller screen Operator Interface Reports Evaporator Report items Units Condenser Report Items UnitsCompressor Report Items Units Motor Report Items UnitsRPM Purge Report Items UnitsHistoric Diagnostics Log Ashrae Chiller Log UnitsRLA PPMChilled Water Setpoint Feature Settings Mode OverridesDescription Units Default Monitor Value ChillerDescription Units Default Display SettingsPurge Operator Interface Operator Interface Operator Interface Operator Interface Operator Interface Interprocessor Communication Inter Processor Communications IPC3IPC3 Definitions Bus Management BindingControl panel components layout and approximate dimensions Control System ComponentsControl System Components Control Panel Devices Machine Shutdown Manual Reset MMR Head Relief Request OutputCompressor Running Relay OpstRefrigerant Monitor Input 1A17 ExopFrcl Free Cooling Option Hgbp Hot Gas Bypass OptionTrmm TRM4 Tracer Comm 4 interface Cdrp Condenser Refrigerant Pressure OutputTemperature based Condenser Pressure OutputPressure based Refrigerant Differential Pressure Indication Output Gbas Generic Building Automation System GbasPercent RLA Output Module Characteristics External Chilled Water Setpoint EcwsExternal Current Limit Setpoint Wpsr WFC Water Pressure Sensing Option1A8, 1A9, 1A11, 1A12 Quad Relay Output Status 1A13, 1A18, 1A19, 1A20 Dual Binary input module1A14 Communication interface Module Comm +Recommended Length to Run external Output signals 1A15, 1A16, 1A17, 1A21 Dual Analog Input/output ModuleAnalog Input Unit mounted devices Control Sequence of Operation Electrical SequenceUCP and Wye-Delta Starter Control Circuits Delay time 200 msec. Opens 2K1 Control Sequence of Operation Test and start timing sequence AFD Momentary Power Loss MPL Protection Machine Protection Adaptive ControlCurrent Overload Protection Overload trip time versus percent RLAPhase Loss Protection Current Limit ProtectionReverse Rotation Protection Differential to Start or Stop SoftLoadingMinimum and Maximum Capacity Limit Leaving Water Temperature Cutout Evaporator LimitLow Refrigerant Temperature Cutout Main Processor Software Revision 6.0 and higherCutout strategy Evaporator Variable Flow Compensation Condenser LimitRestart Inhibit Start to Start Time Setting Restart InhibitRestart Inhibit Free Starts Clear Restart InhibitHigh Vacuum Lockout Oil Temperature Control Controls Chilled Water Reset CWR Outdoor Air TemperatureMaximum Reset Return WaterValues for start reset types Degrees of ResetConstant Return EquationReset Ratio Outdoor air temperature versus degrees of resetReset function for return CWR Reset Ratio = 50% Return CWR Unit Start-Up Procedures Unit StartupDaily Unit Start-Up Before changeover to heating mode Live Electrical ComponentsToxic Hazards Seasonal Unit Start-UpUnit Shutdown Procedures Unit ShutdownOil Pump Heater Operation Seasonal Unit ShutdownPeriodic Maintenance Daily Maintenance and ChecksMoisture Contamination Record Keeping FormsWeekly Maintenance Normal Chiller Operating CharacteristicsHazardous Voltage w/ Capacitors Every 3 MonthsOff-Season Maintenance Annual MaintenanceOil Maintenance Oil Change ProcedureHeater Damage Compressor Oil Change onOil Filter Replacement Replacing Oil FilterMaintenance Oil Supply System ProblemsOther Maintenance Requirements LubricationDo not Leave Grease Fittings Installed Front View with Refrigerant PumpContains Refrigerant Refrigerant ChargeRecovery and Recycle Connections Leak TestingCleaning the Condenser Proper Water TreatmentCleaning the Evaporator Control Settings AdjustmentsUnit Corrosion Damage Purge System Unit PreparationHazardous Voltage w/ Capacitors 100 101 102 103 104 105 106 107 108 109 110 111 Trane

CVHE-SVU01E-ENX39640712050 specifications

The Trane CVHE-SVU01E-ENX39640712050 is a high-efficiency centrifugal chiller designed for commercial and industrial applications. This state-of-the-art unit is engineered to provide reliable cooling performance, energy efficiency, and optimized operational flexibility. It is particularly suitable for large-scale facilities that require significant cooling capacity and robust performance under varying load conditions.

One of the most notable features of the CVHE-SVU01E series is its advanced variable speed drive technology. This technology enables the chiller to adjust its speed according to the cooling demands of the facility, resulting in substantial energy savings. By operating at optimal speeds, this unit reduces power consumption and enhances overall efficiency. This is noteworthy in the context of rising energy costs and increasing sustainability demands across various industries.

Moreover, the CVHE-SVU01E is equipped with Trane’s proprietary Compliant Scroll compressor technology. This innovative compressor design minimizes mechanical losses and increases the efficiency of the chiller system. Additionally, the compressor is specifically designed to handle varying refrigerant flow rates, allowing the chiller to maintain performance even when faced with fluctuating conditions.

Another significant characteristic of this chiller model is its use of environmentally friendly refrigerants, aligning with global regulations aimed at reducing greenhouse gas emissions. This commitment to sustainability ensures that the CVHE-SVU01E not only provides excellent cooling performance but also adheres to contemporary environmental standards.

The unit utilizes an advanced control system that simplifies operation and enhances troubleshooting capabilities. The intuitive interface allows facility managers to monitor performance metrics, optimize operation schedules, and conduct remote diagnostics, significantly reducing costly downtime and maintenance efforts.

Furthermore, the compact and modular design of the CVHE-SVU01E makes it easy to install in various settings. Its durability is ensured through the use of high-quality materials and components, designed to withstand the rigors of demanding environments. With reduced maintenance requirements, facility operators can focus on core business functions without frequent interruptions.

In summary, the Trane CVHE-SVU01E-ENX39640712050 combines cutting-edge technologies and features to deliver exceptional performance, efficiency, and reliability in commercial cooling applications. Its advanced design contributes to reduced energy costs, minimal environmental impact, and greater operational flexibility, making it an excellent choice for organizations seeking sustainable and efficient cooling solutions.