Greenheck Fan PVE-55 manual Remote Control Panel and Wiring Schematics, Day Timer or On/Off Switch

Page 16

Remote Control Panel and Wiring Schematics

Indicator Lights powered by the ER Unit

The remote panel is a series of junction boxes ganged together and includes a stainless steel faceplate. The remote panel is available with a number of different alarm lights and switches to control the unit. The remote panel ships loose and requires mounting and wiring in the field

The remote panel is available with the following options:

Unit on/off switch

Unit on/off light

7-day time clock

Hand/off/auto switch

Time delay override

Economizer light

Frost control light

Exhaust air dirty filter light

Outdoor air dirty filter light

 

 

R

 

 

C

 

 

G

 

 

Y1

 

 

Y2

 

 

W1

 

 

6

 

 

7

 

 

12

 

PS2

 

NC

C

NO

 

PS3

 

NC

C

NO

Unit On/Off

Frost Control

Economizer

Supply Dirty Filter

Exhaust Dirty Filter

Refer to Electrical Connections section for Field Control Wiring recommendations.

7-Day Timer or On/Off Switch

7-Day Timer

 

R

Terminal Block

 

C

in Unit

S1 - Unit On/Off

Control Center

G

 

For 7-Day Timer, use blue and black wires. Red wires should be capped off.

Hand/Off/Auto Switch

 

R

 

 

C

Terminal Block

 

in unit

On

 

G

Control Center

Off

BMS

 

Auto

 

Dirty Filter Indicator (power by others)

 

PS2

 

 

 

Supply Dirty Filter

NC

C

 

NO

 

PS3

 

 

 

Exhaust Dirty Filter

 

 

 

 

NC

C

 

 

NO

Hot

L1

Refer to Pressure Switch for voltage and load ratings.

Hand/Off/Auto Switch allows the unit to “Off” - off

“On” - Manual Operation

“Auto” - Unit is controlled by BMS, RTU, etc. NOTE: RTU controllers are by others.

16Model PVe Heat Recovery Unit

Image 16
Contents General Safety Information Models PVe-20 PVe-35 PVe-45 PVe-55Inspection and Maintenance during Storage ReceivingUnpacking HandlingTable of Contents Supplemental Installation Operation and Maintenance ManualsInstallation Basic OperationInstallation Stages LiftingLifting with a Crane Lifting with a ForkliftService Clearances Roof Curb and Rail MountingRoof Curb Mounting Curb Dimensions and WeightsDuctwork Connections Access Panel Description and Location Rail Mounting / LayoutDimensional Data Drain TrapElectrical Information Typical Control Center Components Electric Heater Application/OperationOptional Accessories Frost Control Application/OperationEconomizer Application/Operation Timed Exhaust frost controlFactory Set Points Variable Frequency Drives for Energy Recovery BlowersDrive Operation Modulating Control for FAN Speed Typical Wiring Diagram Service Outlet Dirty Filter SensorCO2 Sensor Vapor Tight LightsRemote Control Panel and Wiring Schematics Indicator Lights powered by the ER UnitDay Timer or On/Off Switch Hand/Off/Auto SwitchSensors Mounted by Factory Drawing Terminal Strip LabelsPre Start-Up Checklist check as items are Start-Up ChecklistStart-Up General Start-Up InformationOptional Accessories Checklist Optional Accessories sectionEconomizer Application / Operation section Variable Frequency Drives sectionUnit Start-Up Vibration Maintenance Overview Routine Maintenance LubricationDampers Fan BeltsExternal Filter Maintenance Internal Filter MaintenanceDoor Seal Maintenance Fan Wheel & FastenersParts List Sequence of Operation Other AccessoriesBasic Unit Summer OperationTroubleshooting Airflow Test and Balance ReportDesign Airflow Measured AirflowTroubleshooting Unit Symptom Possible Cause Corrective ActionTroubleshooting Unit Maintenance Log Maintenance Log Maintenance Log Warranty