The unit must be electrically grounded in accordance with the current National Electrical Code, ANSI/ NFPA 70. In Canada, use current CSA Standard C22.1, Canadian Electrical Code, Part 1. In addition, the installer should be aware of and comply with any local ordinances or electrical power company requirements that might apply. System power wiring must be properly fused and conform to the local and national electrical codes. System power wiring is to the main disconnect (door interlocking disconnect switch standard on most units) or distribution block and must be compatible with the ratings shown on the nameplate: supply power voltage, phase, and amperage (Minimum Circuit Amps - MCA, Maximum Overcurrent Protection - MOP). All wiring beyond this point has been done by the manufacturer and cannot be modified without affecting the unit’s agency / safety certification.

If field installing an additional disconnect switch, it is recommended that there be at least four feet of service room between the switch and system access panels. When providing or replacing fuses in a fusible disconnect, use dual element time delay fuses and size according to the rating plate.

If power supply is desired through the bottom of unit, run the wiring through the curb, cut properly aligned holes in the insulation pan and the bottom of the PVe cabinet bottom and wire to the disconnect switch.

Seal penetrations to prevent leakage or air infiltration.

The electric supply to the unit must meet stringent requirements for the system to operate properly. Voltage supply and voltage imbalance between phases should be within the following tolerances. If the power is not within these voltage tolerances, contact the power company prior to operating the system.

Voltage Supply: See voltage use range on the rating plate. Measure and record each supply leg voltage at all line disconnect switches. Readings must fall within the allowable range on the rating plate.

Voltage Imbalance: In a 3-phase system, excessive voltage imbalance between the phases will cause motors to overheat and eventually fail. Maximum allowable imbalance is 2%. To determine voltage imbalance, use recorded voltage measurements in this formula.

Key: V1, V2, V3 = line voltages as measured VA (average) = (V1 + V2 + V3) / 3

VD = Line voltage (V1, V2 or V3) that deviates farthest from average (VA)

Formula: % Voltage Imbalance = [100 x (VA-VD)] / VA

CAUTION

If any of the original wire as supplied with the appliance must be replaced, it must be replaced with wiring material having a temperature rating of at least 105ºC.

WARNING

To prevent injury or death due to electrocution or contact with moving parts, lock disconnect switch open.

Most factory supplied electrical components are pre-wired. To determine what electrical accessories require additional field wiring, refer to the unit-specific wiring diagram located on the inside of the unit control center access door. The low voltage control circuit is 24 VAC and control wiring should not exceed 0.75 ohms.

Refer to Field Control Wiring Length/Gauge table for wire length maximums for a given wire gauge.

Field Control Wiring Length/Gauge

Total

Minimum

Wire Length

Wire Gauge

125 ft.

18

200 ft.

16

300 ft.

14

450 ft.

12

Control wires should not be run inside the same conduit as that carrying the supply power. Make sure that field supplied conduit does not interfere with access panel operation.

If wire resistance exceeds 0.75 ohms, an industrial- style, plug-in relay should be added to the unit control center and wired in place of the remote switch (typically between terminal blocks R and G on the terminal strip (refer to Typical Control Center Components). The relay must be rated for at least 5 amps and have a 24 VAC coil. Failure to comply with these guidelines may cause motor starters to “chatter” or not pull in which can cause contactor failures and/or motor failures.

Model PVe Heat Recovery Unit 9

Image 9
Contents Models PVe-20 PVe-35 PVe-45 PVe-55 General Safety InformationReceiving Inspection and Maintenance during StorageUnpacking HandlingSupplemental Installation Operation and Maintenance Manuals Table of ContentsInstallation Basic OperationLifting Installation StagesLifting with a Crane Lifting with a ForkliftRoof Curb and Rail Mounting Service ClearancesCurb Dimensions and Weights Roof Curb MountingDuctwork Connections Rail Mounting / Layout Access Panel Description and LocationDrain Trap Dimensional DataElectrical Information Electric Heater Application/Operation Typical Control Center ComponentsFrost Control Application/Operation Optional AccessoriesEconomizer Application/Operation Timed Exhaust frost controlVariable Frequency Drives for Energy Recovery Blowers Factory Set PointsDrive Operation Modulating Control for FAN Speed Typical Wiring Diagram Dirty Filter Sensor Service OutletCO2 Sensor Vapor Tight LightsIndicator Lights powered by the ER Unit Remote Control Panel and Wiring SchematicsDay Timer or On/Off Switch Hand/Off/Auto SwitchDrawing Terminal Strip Labels Sensors Mounted by FactoryStart-Up Checklist Pre Start-Up Checklist check as items areStart-Up General Start-Up InformationOptional Accessories section Optional Accessories ChecklistEconomizer Application / Operation section Variable Frequency Drives sectionUnit Start-Up Vibration Maintenance Overview Lubrication Routine MaintenanceDampers Fan BeltsInternal Filter Maintenance External Filter MaintenanceDoor Seal Maintenance Fan Wheel & FastenersOther Accessories Parts List Sequence of OperationBasic Unit Summer OperationTest and Balance Report Troubleshooting AirflowDesign Airflow Measured AirflowSymptom Possible Cause Corrective Action Troubleshooting UnitTroubleshooting Unit Maintenance Log Maintenance Log Maintenance Log Warranty