Greenheck Fan PVE-35, PVE-55, PVE-20, PVE-45 manual Roof Curb and Rail Mounting, Service Clearances

Page 5

Roof Curb and Rail Mounting

Service Clearances

When installed on a roof, a typical installation will include at least one roof penetration in order to deliver return air to the unit from the space. Additionally, a second roof penetration may be used for supply air discharge to the space.

Intake and Discharge Options

Option

Bottom

Top

Side

End

 

 

 

 

 

OA Intake

 

 

 

X

CLEARANCE

B

C

A

D

CLEARANCE

 

SA Discharge

X

 

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RA Intake

 

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EA Discharge

 

 

 

 

 

 

 

 

 

X

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OA - Outdoor Air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SA - Supply Air (to the space)

 

 

 

 

 

 

 

 

 

 

RA - Return Air (from the space)

 

 

 

 

 

 

 

 

 

 

EA - Exhaust Air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

EA Discharge

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SA Discharge

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SA Discharge

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OA Intake

 

 

 

E

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

RA Intake

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Duct Dimensions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model

 

 

 

A

B

 

C

 

D

 

E

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PVe-20

 

10.7

 

12.2

 

10.3

 

11.8

 

22.0

14.0

 

 

 

(280)

 

(310)

 

(270)

 

(300)

 

(570)

(360)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PVe-35

 

11.9

 

13.7

 

11.4

 

13.1

 

34.0

14.0

 

 

 

(310)

 

(350)

 

(290)

 

(340)

 

(870)

(360)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PVe-45

 

14.1

 

16.0

 

13.3

 

14.5

 

46.0

14.0

 

 

 

(360)

 

(410)

 

(340)

 

(370)

 

(1170)

(360)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PVe-55

 

16.4

 

19.2

 

15.9

 

18.6

 

60.0

14.0

 

 

 

(420)

 

(490)

 

(450)

 

(480)

 

(1530)

(360)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

All dimensions are shown in inches (millimeters).

Position the unit roof opening such that the Return Air Intake will line up with the corresponding ductwork.

If applicable, adjust position to also accommodate the SA Discharge vent. Make certain that proposed positioning of the unit still maintains recommended service clearances.

D

Model

A

B

C

D

 

 

 

 

 

PVe-20

36

36

36

60

(920)

(920)

(920)

(1530)

 

 

 

 

 

 

PVe-35

48

36

36

60

(1220)

(920)

(920)

(1530)

 

 

 

 

 

 

PVe-45

60

36

36

60

(1530)

(920)

(920)

(1530)

 

 

 

 

 

 

PVe-55

72

36

36

60

(1830)

(920)

(920)

(1530)

 

 

 

 

 

 

All dimensions are shown in inches (millimeters). The weatherhoods include 2-inch aluminum mesh filters that are removed out of the end of the hood as shown in this drawing and require extra clearance for removal.

Do not face the Outdoor Air Intake of the unit into prevailing wind and also keep the air intake away from any other exhaust fans. Likewise, position the Exhaust Air Discharge opening away from any other outdoor air intakes of other equipment.

When cutting duct openings, cut opening one inch larger (25 mm) than duct size to allow clearance for installation. Area enclosed by roof curb must comply with clearance to combustible materials. If the roof is constructed of combustible materials, area within the roof curb must be ventilated, left open or covered with non-combustible material which has an “R” value of at least five (5). If area within curb is left open, higher radiated sound levels may result.

Where the supply or warm air duct passes through a combustible roof, a clearance of one inch must be maintained between the outside edges of the duct and combustible material in accordance with NFPA Standard 90A.

Model PVe Heat Recovery Unit 5

Image 5
Contents Models PVe-20 PVe-35 PVe-45 PVe-55 General Safety InformationReceiving Inspection and Maintenance during StorageUnpacking HandlingSupplemental Installation Operation and Maintenance Manuals Table of ContentsInstallation Basic OperationLifting Installation StagesLifting with a Crane Lifting with a ForkliftRoof Curb and Rail Mounting Service ClearancesDuctwork Connections Curb Dimensions and WeightsRoof Curb Mounting Rail Mounting / Layout Access Panel Description and LocationDrain Trap Dimensional DataElectrical Information Electric Heater Application/Operation Typical Control Center ComponentsFrost Control Application/Operation Optional AccessoriesEconomizer Application/Operation Timed Exhaust frost controlDrive Operation Variable Frequency Drives for Energy Recovery BlowersFactory Set Points Modulating Control for FAN Speed Typical Wiring Diagram Dirty Filter Sensor Service OutletCO2 Sensor Vapor Tight LightsIndicator Lights powered by the ER Unit Remote Control Panel and Wiring SchematicsDay Timer or On/Off Switch Hand/Off/Auto SwitchDrawing Terminal Strip Labels Sensors Mounted by FactoryStart-Up Checklist Pre Start-Up Checklist check as items areStart-Up General Start-Up InformationOptional Accessories section Optional Accessories ChecklistEconomizer Application / Operation section Variable Frequency Drives sectionUnit Start-Up Vibration Maintenance Overview Lubrication Routine MaintenanceDampers Fan BeltsInternal Filter Maintenance External Filter MaintenanceDoor Seal Maintenance Fan Wheel & FastenersOther Accessories Parts List Sequence of OperationBasic Unit Summer OperationTest and Balance Report Troubleshooting AirflowDesign Airflow Measured AirflowSymptom Possible Cause Corrective Action Troubleshooting UnitTroubleshooting Unit Maintenance Log Maintenance Log Maintenance Log Warranty