Thermador HS-HST-HSB installation instructions Tab

Page 10

BEFORE INSTALLING HOOD

Discharge Direction: The hood is shipped ready for horizontal discharge. To change to vertical discharge move plate to the rear side and ventilator (if supplied) to the top side.

The plate and ventilator are held in place by four nuts each, see also Figures 3 and ,at page 9, Figure A and Figure B.

Read also paragraph “Integral Ventilator Installation” at pages 14-15 for further informations. Note: If an integral ventilator is already supplied (HSB series hoods only), remove it to allow installation of hood to the wall/cabinet.

Assembly of the Transition: The transition supplied with the hood mounts to the top of the hood, Figure 4.

1.Fold outwards all six Tabs (HS and HSB series only).

2.Align mounting holes at base of transition with mounting holes on 1/2” flange located at the top of the hood.

3.Fasten transition to hood using 6 (4 mm x 9.5 mm) screws (included with hood).

4.Duct tape connection between transition and hood.

5.Remove tape holding damper

Plate

Figure 3

Transition

Top outlet

plate fixing point

Tab

Figure 4

Page 10

Image 10
Contents Read and Save These Instructions Important Safety Instructions FIRE, USE only Metal Duct WorkEvacuateandcallthefire Department LES Instructions DE Sécurité Importantes Seulement si Parts Included with your Hood Before Installing Hood Appliance Installation Cabinet or Soffit PreparationTypical Installation DuctingTab 2 7 1/16 Wall Mount Installation HST series Hood only see Figure 67/8Page Integral Ventilator Installation Cabinet Installation FigureModels VTN420B or VTN620B see figure Wiring the Hood with an IntegralVentilator Remove the j-box cover as shown in FigureWiring the Hood with a Remote Ventilator Fixing Screws number depends on hood size