Cleveland Range OGS-10.10, OGB-6.20, OGS-6.20, OGB-10.10 manual

Page 74

120 VAC is sent from terminal 1 of connector X13 on the Control Board (A10) to the Generator Pump (M4).

As the water level drops below the probes the fill solenoid (Y3) will energize. This rocking of the water will help flush scale from the generator.

Then the pump will be energized again

When the condensate box is heated to 140 degrees F at the B3probe, 120 VAC is sent from terminal 5 of connector X12 to the condenser valve (Y1) until the temperature drops.,

bThe display will show the set temperature and set time.

cThe Control Board (A10) will check the water level by looking for a ground at terminals 1 and 2 on connector X15. These are connected to the high and low probes (B1) in the steam generator.

If the ground is not found 120 VAC is sent from terminal 7 on connector X12 on the Control Board (A10) to the fill solenoid (Y3)

The fill solenoid opens and the generator is filled until both probes are grounded.

If the top probe becomes ungrounded for more that 5 seconds the fill solenoid (Y3) will energize.

If the bottom probe becomes ungrounded the combi will fill immediately and the combi will not heat

dWhen the terminal 2 on connector X15 is grounded, the Control Board (A10) transmits and receives a signal from terminals 5,6,7 and 8 on connector X10 to terminals 3,4,5 and 6 of connector X28 on the Gas Board (A20)

The Gas Board (A20) begins the steam generator heat circuit

A signal is sent from terminal 8 of connector X24 to terminal 4 of connector X2 on the Steam Power Burner and Fan Control (U21) selecting the set speed of the combustion blower.

(a)When this speed is attained the signal is sent from terminal 2 of connector X2 on the Steam Power Burner and Fan Control (U21) to terminal 9 of connector X24 on the Gas Board (A20)

A request for heat is sent from terminal 3 of connector X21 on the Gas Board (A20) to terminal 10 on connector X1 on the Steam Burner Control Module (N21)

(a)24 VAC is sent from terminal 2 of connector X2 on the Steam Burner Control Module (N21) to the hot surface igniter (R20).

(b)The gas valve is energized allowing gas and air into the burner chamber to be ignited by the hot surface igniter.

(c)The Steam Burner Control Module (N21) senses at least 1.5 micro amps DC from the flame sensor (P1) at terminal 3 of connector X2 and sends a signal from terminal 2 of connector X1 to terminal 11 of connector X25 on the Gas Board (A20)

The steam generator heat circuit continues until 190 degrees F is detected from the Steam Generator probe (B4) at terminals 1 and 2 of connector X17 on the Control Board (A10)

4With the combi in the steam mode with time on the timer, the door closed and the start switch is depressed

67

Image 74
Contents Service & Parts Manual Table of Contents Service Parts Maintenance For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless TOP View Model χ OGB-6.20 Saves energy Model χ OGS-6.20 Optional Plate Rack holds 42 plates Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning Light Gasket C6015020 Condensate Box o-ring C6015000QTY Part N0 Description GAS INJ W Cleaning ASSY, Control PANEL, SPRITZER, with Picto GAS GEN W Cleaning ASSEMBLY/WELDMENT, Intermediate TOP, 6.20/10.20 Spray Handle Shut Off Valve C6014003 ASSEMBLY, Intake PLATE, Gas Component Panel ASSEMBLY, GAS OGB 6.20 & 10.10 ModelsPanel ASSEMBLY, Models GASOGS 6.20 & 10.10 Models ASSEMBLY, Control PANEL, with Picto ALL ModelsBASE, GAS Injector With Cleaning OGS 10.10 Models BASE, GAS Injector No Cleaning OGS 10.10 Models BASE, GAS Generator With Cleaning OGB 6.20 Models BASE, GAS GENERATOR, no Cleaning OGB 6.20 Models BASE, GAS Injector With Cleaning OGS 6.20 ModelsPage ASSEMBLY, Water Hose SYSTEM, Condenser ASSEMBLY, Water Valve ALL GAS 10.10 ModelsModels ASSEMBLY, Water VALVE, INJECTOR, GAS ASSEMBLY, Water SUPPLY, Generator W/CLEANING System OEB & OGB 6.20 ModelsALL GAS 6.20 Models Push Button SWITCH, INJ, CHANGE-OVER Contact ASSEMBLY, Steam GENERATOR, GAS OGB 6.20 ModelsPUMP, Steam GENERATOR, GAS ALL GAS ModelsASSEMBLY, Burner INSERT, Steam GENERATOR, NAT GAS Venturi 40 KWBurner INSERT, HL, PRE-MOUNTED ASSEMBLY, Burner INSERT, AIR, LP & NAT GAS Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20Door 6.20 Complete OES 6.20 & 10.10 ModelsSliding PLATE, Complete ALL 6.20 &10.10 ModelsALL 6.20 & 10.10 Models Exterior Sheeting STAND, ASSEMBLY, Closed Base 10 & 10.10 ModelsPage Page Page Page ASSEMBLY, Stacking KIT, GAS Models 20 on 6.20 or 10 on 6.10 orASSEMBLY, Stacking KIT, Electric Models PIPE, Steam EXHAUST, ELECTRIC, Stacking KITCleveland Range OGB 6.20/10.10 Sequence of Operations Page Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram X12GND X23 X10 N20 N21 IVE Ladderdiagram Ladder DI RAM Cleveland Range OGS 6.20/10.10 Sequence of Operations Page Page Page Page Page OGS 6.20/10.10 Preliminary X39 A12 Preliminary Ladder Diagram Ladder