Cleveland Range OGB-10.10, OGB-6.20, OGS-6.20, OGS-10.10 manual

Page 91

When the heat circuit is energized the heat symbol will be energized

The cooking mode symbol will be energized.

The time display will invert and begin to count down.

bThe fan circuit is energized by the Control Board (A10) transmitting and receiving a signal from terminals 5,6, and 7 on connector X10 to connector X12 on the Motor Drive Board (U10).

The motor Drive Board sends a signal through the thermal switch in the motor from Terminal 5 and receives on terminal 6

If the thermal switch is not open the Motor Drive Board (U10) sends 240 VAC 3 phase to the motor.

The motor reverses direction every 120 seconds with a 15 second coast.

cHot air heat circuit is energized

A signal is sent from terminal 8 of connector X15 on the Control Board (A10) to terminal 4 of connector X2 on the Hot Air Power Burner and Fan Control (U20) selecting the set speed of the combustion blower.

When this speed is attained the signal is sent from terminal 2 of connector X2 on the Hot Air Power Burner and Fan Control (U20) to terminal 2 of connector X15 on the Control Board (A10)

A request for heat is sent from terminal 3 of connector X12 on the Control Board (A10) to terminal 10 on connector X1 on the Hot Air Control Module (N20)

24 VAC is sent from terminal 2 of connector X2 on the Hot Air Control Module (N20) to the hot surface igniter (R20).

The gas valve is energized allowing gas and air into the burner chamber to be ignited by the hot surface igniter.

The Hot Air Burner Control Module (N20) senses at least 1.5 micro amps DC from the flame sensor (P1) at terminal 3 of connector X2 and sends a signal from terminal 2 of connector X1 to terminal 12 of connector X15 on the Control Board (A10)

The heat circuit will remain energized until the cabinet set temperature is reached as sensed at probe B6.

dThe steam circuit is energized

120 VAC is sent from terminal 4 of connector X12 on the Control Board (A10) to the coil of the Y3 solenoid allowing water to be thrown against the element until the bypass probe (B5) senses 183 degrees F.

NOTE: If the set temperature is above 212 degrees F the hot air circuit will be energized (after the by pass probe is satisfied) until the compartment setting is reached.

eWhen the condensate box is heated to 140 degrees F at the B3probe, 120 VAC is sent from terminal 5 of connector X12 to the condenser valve (Y1) until the temperature drops.

fWhen the timer counts to 0 or the core temp probe (B10) reaches the set amount the cycle ends and the steam generator reverts to the standby temperature of 190- degree F.

5With the combi in the Hot Air mode with time on the timer, the door closed and the start switch is depressed

84

Image 91
Contents Service & Parts Manual Table of Contents Service Parts Maintenance For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless TOP View Model χ OGB-6.20 Saves energy Model χ OGS-6.20 Optional Plate Rack holds 42 plates Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page Light Gasket C6015020 Condensate Box o-ring C6015000 GAS Generator W CleaningQTY Part N0 Description GAS INJ W Cleaning ASSY, Control PANEL, SPRITZER, with Picto GAS GEN W Cleaning ASSEMBLY/WELDMENT, Intermediate TOP, 6.20/10.20 Spray Handle Shut Off Valve C6014003 ASSEMBLY, Intake PLATE, Gas OGB 6.20 & 10.10 Models Component Panel ASSEMBLY, GASGAS Panel ASSEMBLY, ModelsOGS 6.20 & 10.10 Models ALL Models ASSEMBLY, Control PANEL, with PictoBASE, GAS Injector With Cleaning OGS 10.10 Models BASE, GAS Injector No Cleaning OGS 10.10 Models BASE, GAS Generator With Cleaning OGB 6.20 Models BASE, GAS GENERATOR, no Cleaning OGB 6.20 Models OGS 6.20 Models BASE, GAS Injector With CleaningPage ASSEMBLY, Water Hose SYSTEM, Condenser ALL GAS 10.10 Models ASSEMBLY, Water ValveModels ASSEMBLY, Water VALVE, INJECTOR, GAS OEB & OGB 6.20 Models ASSEMBLY, Water SUPPLY, Generator W/CLEANING SystemALL GAS 6.20 Models Push Button SWITCH, INJ, CHANGE-OVER Contact OGB 6.20 Models ASSEMBLY, Steam GENERATOR, GASALL GAS Models PUMP, Steam GENERATOR, GASVenturi 40 KW ASSEMBLY, Burner INSERT, Steam GENERATOR, NAT GASBurner INSERT, HL, PRE-MOUNTED Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20 ASSEMBLY, Burner INSERT, AIR, LP & NAT GASOES 6.20 & 10.10 Models Door 6.20 CompleteALL 6.20 &10.10 Models Sliding PLATE, CompleteALL 6.20 & 10.10 Models Exterior Sheeting 10 & 10.10 Models STAND, ASSEMBLY, Closed BasePage Page Page Page 20 on 6.20 or 10 on 6.10 or ASSEMBLY, Stacking KIT, GAS ModelsPIPE, Steam EXHAUST, ELECTRIC, Stacking KIT ASSEMBLY, Stacking KIT, Electric ModelsCleveland Range OGB 6.20/10.10 Sequence of Operations Page Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram X12GND X23 X10 N20 N21 IVE Ladderdiagram Ladder DI RAM Cleveland Range OGS 6.20/10.10 Sequence of Operations Page Page Page Page Page OGS 6.20/10.10 Preliminary X39 A12 Preliminary Ladder Diagram Ladder