FLOOR ASSEMBLY

Lay out all floor panels in sequence as shown on assembly drawings and make sure they are level. Fasten these panels as evenly as possible to one another. Tighten the cam fasteners all the way so that the panels are aligned evenly and as snug one to the other as possible.

CEILING AND WALL PANEL ASSEMBLY

NOTE: When facing the interior of the wall panel, all vertical latch access holes should be on the left side of the panel.

Lay out wall panels in accordance with the assembly drawings supplied with the walk-in. It is suggested to begin by assembling the front of the walk-in first. The front is normally considered that portion of the walk-in that has the walk-thru door in it. However, if the walk-in is to be installed inside an existing building or space with two or three of the walk-in walls restricted, assembly then may be accomplyshed easier by beginning at the rear (opposite the door wall). Assemble the wall panels of the front portion until you get to both corners and then start to assemble roof sections so as to secure that portion of the walls that are already in place. As wall panels are assemled, they should be completely aligned and cam fasteners completely tightened. If wall panels appear to have a stair-step effect on the top horizontal egde as thy are being assembled, the foor is not level. At this point, you must stop immediately and take corrective measures to poperty level floor panels. All walls and corners can be assembled prior to the installation of the ceiling. As ceiling panels are assembled, each one should be property aligned to the adjoining ceiling and wall panels and locked into position as tightly as possible.

DOOR AND FRAME INSTALLATION

NOTE: It is very important that the floor be level where that walk-in is to be installed. Shims may be installed under the floor, if necessary, to ensure that the entire walk-in is square and plumb.

ROOF PANEL

1/4" SPACE

FLOOR PANEL

SHIMS

Figure #9

1.Set wall and roof panels, except the roof panel above door frame and adjoining corner panel to the right side of the door frame (when facing the inside of the door), in accordance with the Walk-in Installation instructions and plan drawing supplied. (Make sure all are assembled square and plumb to ensure proper operation.)

2.Set door and frame in place.

3.Place a spirit level against the door frame leg (inside door opening) to ensure that it is correctly aligned vertically, and latch the door frame to the adjoining wall/corner panel.

10

Image 10
Contents Installation & Operations Manual Page Table of Contents Introduction Store ConditionsGround Required For Safe Operation Inspection for Shipping Damage PRE-INSTALLATION InstructionsInstallation Instructions General Instructions Electrical Panel StorageCAM Fasteners Figure #3Level Floor CaulkingCeiling and Wall Panel Assembly Floor AssemblyDoor and Frame Installation Adjusting Door and Replacing Hinges RefrigerationDoor Frame Heater Replacement Temperature ControlsFinal Check List Set three 30 minutes per 24 hoursSale and Disposal MASTER-BILT Part NumbersOwner Responsibility Page Page Page Page