4.Using the same procedure as above continue with the installation of the remaining corner panels.
5.Place a carpenter’s level against the face of the door frame to ensure correct vertical alignment and latch the door frame to the roof panel while holding level in place.
6.Adjust the bottom wiper gasket of the door to the point that it sweeps the finished floor when the door is in the fully closed position. (Note: do not adjust the wiper gasket so far downs that it prevents the door from closing property.)
7.Before securing the panels to the floor, double check the door frame alignment by placing a carpenter’s level vertically against each door frame leg.
8.Connect correctly fused
REFRIGERATION
NOTE: Wiring diagrams are located inside
Be sure electrical service is the same as the electrical characteristics on the compressor data plate. Connect correctly fused service line to the service line
After routing condensate line with standard trap from drain pan of evaporator coil, seal around drain line with silicone or butyl caulking to prevent moist air entering box from outside.
Start compressor and allow running at least 24 hours before committing product into the
ADJUSTING DOOR AND REPLACING HINGES
NOTE: all
1.Place shims under door ( See Figure #9)
2.Loosen to adjust or remove to replace those screws that attach hinge blade to door. When adjusting door hinges do not screws fastening hinge to frame of door.’
3.Shim under door as necessary to provide a ¼” space between top of door and the door frame to ensure square fit( See Figure #9)
4.Tighten or reinstall screws attaching the hinge blade to the door.
5.The following procedure should be followed if one or all hinges are replaced.
6.After adjusting or replacing the hinges, remove shims and check the space at the top of the door periodically for proper alignment.
11