Master Bilt CMICL-156 manual Final Check List, Set three 30 minutes per 24 hours

Page 13

FINAL CHECK LIST

A.Check operating pressures.

B.Check electrical requirements of unit to supply voltage.

C.Set temperature control for desired temperature range

D.Check system for proper defrosts settings and operation.

1. Set three 30 minutes per 24 hours.

E.Check condensing unit for vibrating or rubbing tubing. Dampen and clamp as required.

F.All valves should be completely opened counter-clockwise.

G.Check for the interior of the wall panel. All vertical latch access holes should be on the left side of the panes.

H.Replace all service valve caps and latch unit covers.

.

SERVICE INSTRUCTIONS (Trouble Shooting Guide)

1.High head pressure and high back pressure

A.Condenser coil clogged or restricted.

B.Condenser fan motor defective.

2.Low back pressure and low head pressure

A.Restriction in system.

B.Refrigerant undercharged.

C.Leak in system.

3.Pressures normal – Cabinet warm

A.Coil blocked with frost or ice

B.Refrigerant undercharged.

C.Control set too warm.

D.Air screen disturbance.

4.Coil blocked with frost or ice

A.

Defective temperature control.

E.

P-trap in drain not installed.

B.

Time clock not operating properly.

F.

Doors aren’t sealing when closed.

C.

Improper time clock setting.

G.

Evaporator fans motor defective.

D.

Defrost heater not operating.

I.

Low voltage.

5.Compressor starts and runs – but cycles on overload

A.Low voltage.

B.Dropped phase (3 phase).

C.Overload protector defective.

D.High head pressure (See #1).

13

Image 13
Contents Installation & Operations Manual Page Table of Contents Store Conditions IntroductionGround Required For Safe Operation Installation Instructions PRE-INSTALLATION InstructionsInspection for Shipping Damage General InstructionsPanel Storage ElectricalFigure #3 CAM FastenersCaulking Level Floor Ceiling and Wall Panel Assembly Floor Assembly Door and Frame Installation Refrigeration Adjusting Door and Replacing HingesTemperature Controls Door Frame Heater ReplacementSet three 30 minutes per 24 hours Final Check ListSale and Disposal MASTER-BILT Part NumbersOwner Responsibility Page Page Page Page