Q: Problem

Water is leaking under the unit.

A: Solution

A water leak under the unit is most likely caused by a bad connection in the water supply line. Make sure the water line’s brass fitting is screwed tight to its valve and threaded correctly. Make sure the fill tube’s connection to the water line is also tight. Check drain line to make sure it has not been disconnected from drain connection on back of the unit or disconnected from the drain.

Q: Problem

The door remains open unless it is pushed closed.

A: Solution

The hinges should be self-closing when the door is open approximately 8". If this is not the case, make sure the closers (at the bottom of the hinge pin) are clean, greased and installed correctly. Also, re-check leveling from front to back of the unit and readjust if necessary. Make sure that pivot plate is installed correctly.

Q: Problem

The custom overlay door was designed to align with the rest of the cabinet doors, but the unit has crept forward.

A: Solution

First, make sure that the electrical cord and water supply line are not obstructing the installation. If they are not, there is mostly likely not enough room allowed for the drain connection on the rear of the unit. You may need to alter the wall behind the unit to accommodate the drain connection.

10 Start-Up for the First Time

Initial Start-Up

Once installation and leveling is complete, the unit is ready for initial start-up and operation. The cycle selector switch is located in the front grille (see Figure 45).

I C E

O F F

C L N

I C E

O F F

C L N

Cycle Selector

Switch

Figure 45

1.Open the door and remove the cover in front of the evaporator by gently compressing and pulling forward. This will enable you to observe the water flow over the evaporator.

2.Check that the overflow tube is inserted securely into the water trough.

3.Put the cycle selector switch (in the grille) in the ICE position (press the switch up). The water fill valve will energize and fill the water reservoir. The water fill valve shuts off after approximately 180 seconds (3 minutes). The compressor begins to operate.

www.U-LineService.com

18

02/2005

Image 18
Contents CLR2060 Clear Ice Maker Contents Follow Safety PrecautionsTools/Materials Required General PrecautionsInspect and Plan InspectionDoor Swing/Clearances Information Product DimensionsCut-Out Dimensions Prepare SiteReversing the Door Side-By-Side Installation Instructions Other Site RequirementsCustom 1/4 Door Panel Insert Prepare and Install Door PanelDoor Panel Installation Door Panel PreparationFull Overlay Door Panel Installation Instructions Attaching the Full Overlay PanelAssembling the Door Adjusting Door Alignment Adjust DoorChecking Door Alignment Drain Connection Prepare PlumbingGravity Drain Factory-Installed Drain Pump Locally-Installed Drain Pump Go on to 7 Prepare Power Supply Water Supply ConnectionElectrical Specifications Prepare Power Supply Level the UnitLeveling Information Installation of the CLR2060 Installation TipInstall the Unit Installation Troubleshooting Initial Start-UpStart-Up for the First Time Start-Up Troubleshooting About SettingsService Information Who to Call