U-Line CLR2060 manual Start-Up Troubleshooting, About Settings

Page 19

CLR2060 — Clear Ice Maker

 

4.Watch the water flow over the evaporator assembly (ice cube tray) to familiarize yourself with the operation. Upon initial start-up, water flow over the evaporator may be uneven. This may cause uneven sized cubes or water spilling into the ice storage bin. This is a normal situation and will correct itself within the first 24 hours of operation.

5.Replace the evaporator cover.

IMPORTANT

It is possible that dirt or scale will dislodge in the water line. Always throw away all ice cubes made during the first two to three hours of operation.

Start-Up Troubleshooting

Q: Problem

Unit does not appear to turn on when switch is set to ICE.

A: Solution

Remember that the compressor will not operate until the water has been filling for about 3 minutes. Make sure unit is plugged in and outlet has power (circuit breaker has not tripped). If the unit is equipped with a drain pump, check that the drain line is not obstructed — unit will shut down due to the safety design of the pump if water cannot drain.

About Settings

All settings are factory preset. No adjustments should be necessary at this time. For information about Ice Cube Thickness, see the User Manual.

Q: Problem

Water does not appear to be flowing into unit.

A: Solution

Check that the water is connected and turned on, the line is not obstructed and the overflow tube is inserted securely into water trough.

Q: Problem

The unit has been operating for 24 hours and water is still not flowing evenly over evaporator or ice seems slow to release.

A: Solution

Level unit for even water flow. Uneven water flow will reduce ice rate and cause water to spill in ice bin.

IMPORTANT

See the User Manual’s Troubleshooting Guide for more solutions.

02/2005

19

www.U-LineService.com

Image 19
Contents CLR2060 Clear Ice Maker Follow Safety Precautions ContentsInspection General PrecautionsInspect and Plan Tools/Materials RequiredPrepare Site Product DimensionsCut-Out Dimensions Door Swing/Clearances InformationReversing the Door Other Site Requirements Side-By-Side Installation InstructionsDoor Panel Preparation Prepare and Install Door PanelDoor Panel Installation Custom 1/4 Door Panel InsertFull Overlay Door Panel Attaching the Full Overlay Panel Installation InstructionsAssembling the Door Adjust Door Adjusting Door AlignmentChecking Door Alignment Prepare Plumbing Drain ConnectionGravity Drain Factory-Installed Drain Pump Locally-Installed Drain Pump Water Supply Connection Go on to 7 Prepare Power SupplyPrepare Power Supply Level the Unit Electrical SpecificationsLeveling Information Installation Tip Installation of the CLR2060Install the Unit Initial Start-Up Installation TroubleshootingStart-Up for the First Time About Settings Start-Up TroubleshootingWho to Call Service Information