U-Line 3018 CLR 115 V / 60 Hz General Installation, Leveling Information, Installation TIP

Page 10

QUICK START GUIDE

u-line.com

General Installation

LEVELING INFORMATION

1. Use a level to confirm the unit is level. Level should be placed along top edge and side

INSTALLATION TIP

If the room floor is higher than the floor in the cut-out opening, adjust the rear feet to achieve a total unit rear height of 1/8" (3 mm) less than the opening’s rear height. Shorten the unit height in the front by adjusting the front feet. This allows the unit to be gently tipped into the opening. Adjust the front feet to level the unit after it is

edge as shown.

1

2

correctly positioned in the opening.

INSTALLATION

1.

Plug in the power cord.

2.

Gently push the unit into position. Be careful to not

2.If the unit is not level, remove grille and adjust feet as necessary. Use included tool to adjust the height of the rear leveler feet. Turn screw clockwise to raise the rear foot, counter-clockwise to lower.

3.Confirm the unit is level after each adjustment and repeat the previous steps until the unit is level.

Rotate Forward Feet to Adjust

Rotate Clockwise to raise rear leg.

Rotate Counter-Clockwise to lower leg.

 

entangle the power cord, water line and drain line.

3.

Re-check the leveling, from front to back and side to

 

side. Make any necessary adjustments. The unit’s top

 

surface should be approximately 1/8" (3 mm) below

 

the countertop.

4.

Install the anti-tip bracket.

5.

Remove the tape from the glass shelves and wipe out

 

the inside of the unit with a clean, water-dampened

 

cloth.

7

Image 10
Contents Quick Start Guide Welcome to U-LINE Service Information General InquiriesConnect with US Service & Parts Assistance Product Information Property Damage / Injury ConcernsContents Model List Clear Ice MachinesSafety Alert Definitions Safety and WarningEnvironmental Requirements Water Hookup Prepare PlumbingDrain Connection DrainGravity Drain Factory Installed Drain Pump Integrated Door SwingStainless Installation General InstallationInstallation TIP Leveling InformationControl Quick Guide Function Command DISPLAY/OPTIONSICE Cube Thickness Adjustment First UseICE Adjust Warranty Sabbath ModeLine Corporation Limited Warranty Quick Start Guide