Andrew 3.7-Meter Earth Station Antenna manual Polarization at 45 degrees from Optimum Setting

Page 74

Step 5

Step 6

Step 7

Step 8

If the signal amplitude diminishes and does not increase (position B) to the level noted when the antenna was peaked on the side lobe, the antenna is moving away from the main beam; reverse the direction of the antenna movement.

From the original side lobe position (position A), the signal amplitude should now dimin- ish to a null point at position C (minimum amplitude showing only signal noise) and then symmetrically increase again to the same level at position D as noted at position A. At the null point (position C), the antenna is aligned with the alternate (elevation) axis. If the antenna was peaked on a side lobe in azimuth, it was appropriately aligned with the elevation axis; proceed with step 6. If the antenna was peaked on a side lobe in eleva- tion, it was appropriately aligned with the azimuth axis; proceed with step 6 moving the antenna in azimuth rather than elevation.

Move the antenna in elevation while observing the spectrum analyzer screen. If the sig- nal amplitude increases, deceases and then increases again but to a lesser value, the antenna is moving in the wrong direction; reverse the direction of the antenna move- ment. From the original null point, the signal level should increase and decrease alter- nately, but with increasing amplitude until the transponder signal increases to a level of at least 30 dB at which time the main beam. Continue to manually peak the signal to a maximum level using the azimuth and elevation adjustments.

If the antenna is aligned in azimuth and elevation (signal maximized) and 24 transpon- der signals (12 horizontal and 12 vertical) are noted, the polarization adjustment is set incorrectly and must be modified. If 12 transponder signals are noted, they may or may not be the properly polarized signals. Therefore 24 transponder signals must be visually noted in order to determine the proper polarization setting.

Rotate the feed assembly clockwise until 24 transponder signals are noted and of approximately equal amplitude.

NOTE: It is more accurate and visually easier to minimize the alternate set of transpon- der signals rather than maximizing the transponder of interest.

Figure 4-4: Polarization at 45 degrees from Optimum Setting

74

Operation

Image 74
Contents Meter ESA Table of Contents Meter Earth Station Antenna IntroductionCustomer Service Center Proprietary Data Information and Assistance TechnicalOverview Content How to Use This ManualOverview Getting StartedRecommended Tools Getting Started Returning Equipment Step Getting Started For Mpjk Types Only Main Reflector Assembly Enclosure Assembly Reflector-To- Mount Assembly Subreflector Feed System Installation Procedures Overview Foundation PreparationTensioning Step 1b A-325 Tensioning For bolts over four diametersMount Unpacking Assembly Using a Crane Step 4b Ground Mount Assembly Base Hardware Assembly Without a Crane Step Ground Mount Assembly Alignment with Anchor Bolts6a Manual Lift 8a Ground Mount Assembly Base Hardware Motorizable Pedestal Ground Mount Assembly Step 8b Ground Mount Assembly Tiller Arm Hardware8d Ground Mount Assembly Tiller Arm Hardware Manual Pedestal Ground Mount Assembly Step 10 Waxing BoltsStep 13 Elevation and Azimuth Struts Step 17a Azimuth Strut Assembly Front 17b Azimuth Strut Assembly Rear 20 Bracket-Support Plates Top View 21a Elevation Strut Bracket Manual Actuator Assembly Step 22a Manual Actuator Assembly23 Azimuth Pivot Bracket Assembly 25a Jack Unscrew Procedure 26 Protective Boot Attachment 28a Elevation Jack Step Embedded Pipe Ground Mount Assembly Step 29b Left Side Frame AttachmentStep Elevation/Azimuth Strut Assembly 29d Elevation/Azimuth Strut Assembly29f Elevation Axis Weldment Attachment 29g Azimuth Strut/Pointer Attachment 29i Fine Azimuth Adjustment Attachment Reflector Unpacking Step 30a Domestic Pack30b Export Pack Step Assembly 31 Reflector Seam Alignment32 Seam Bolt Insertions Very Important 33c Alignment Bolt Insertions 34a Mounting Ring Placement 35a Mounting and Center Rings -35b Mounting and Center Rings Alignment Test Step 38a Enclosure Final Assembly Enclosure Pedestal Mount Only Step39a Enclosure Hardware Step Reflector-to-Mount Assembly Using a Crane Step 43 Safety Rope Tag Lines44b Crane Lift Without a Crane Step 46 Reflector to Mount 48 Enclosure Bracket Alignment Step 50a Reflector to Mount Reflector-to-Mount Assembly Embedded Pipe Ground Mount Step 52a Subreflector Strut Assembly Subreflector Step53a Subreflector Assembly 53c Subreflector Assembly 54a Subreflector Attachment Subreflector Struts Embedded Pipe Ground Mount Assembly Step Subreflector Adjustment Step Step Step Feed System Overview Acquiring a Satellite Step OperationPure Noise Signal on Spectrum Analyzer Step Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Operation Subreflector Adjustment Preventive Maintenance Overview General Cleaning Electrical PartsPreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Pedestal Mount Bearing Pad Adjustment Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Service Lube Quantity Andrew