Andrew 3.7-Meter Earth Station Antenna manual Step Elevation/Azimuth Strut Assembly

Page 39

Step 2

Elevation/Azimuth

Strut Assembly

Step 3

Attach the 104319 front frame to the left side frame as shown in Figure 3-29c. Attach the 104325 braces to the left side by means of the U-bolts. Attach the right side frame and braces to the front frame and the right side frame to the left side frame, also shown. For all of these joints, use 100532-21 M16x40 long bolts, 100526-51 nuts and 100522- 51 lockwashers. When assembly is in place, tighten to 95 N-m. (70 lbs-ft).

104321

Right Side Frame

104325

Brace

M16

M16 Hex Bolt

Nut

104319

Front Frame

M16

Lockwasher

Figure 3-29c: Front Frame Attachment

Attach 104638 U-bracket to one end of each 301899 support pipe using 100537-87 M20 X 100 hex bolt, 100526-57 M20 hex nut and 100522-57 lockwasher. Attach 301900 strut bracket to 49258 strut support using 45980-1 .625-11 x 2" long bolt and nut assembly. Note: Long bolt and nut assembly should not protrude inside diameter of 49258 strut support. Assemble strut bracket/strut support assembly to support pipe by sliding over strut with welded tab facing 104638 U-bracket. Snug the strut support in place using 9953-15 .50- 13 x 1.5" long square head screws in three places. See Figure 3-29d. Note: For eleva- tions above 75° reverse the strut support so the welded tab faces away from U-bracket.

104638

U-Bracket

 

 

 

 

301899-2

 

 

 

M20 x 100

 

 

 

Support Pipe

 

 

Bolt, Lockwasher

 

 

 

 

 

 

 

 

 

 

and Nut

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2 x 1-1/2”

 

 

301900

 

 

 

 

 

 

 

Square Head Set Screw

 

 

Strut Bracket

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

49258

 

 

 

 

 

 

Strut Support

 

 

 

5/8 x 2”

 

 

Bolt and Nut Assembly

 

 

 

 

 

3/4 x 3”

Bolt, Flatwasher,

Lockwasher and Nut

Figure 3-29d: Elevation/Azimuth Strut Assembly

39

Installation Procedures

Image 39
Contents Meter ESA Table of Contents Introduction Meter Earth Station AntennaProprietary Data Information and Assistance Technical Customer Service CenterHow to Use This Manual Overview ContentGetting Started OverviewRecommended Tools Getting Started Returning Equipment Step Getting Started For Mpjk Types Only Main Reflector Assembly Enclosure Assembly Reflector-To- Mount Assembly Subreflector Feed System Overview Foundation Preparation Installation Procedures1b A-325 Tensioning For bolts over four diameters Tensioning StepMount Unpacking Assembly Using a Crane Step 4b Ground Mount Assembly Base Hardware Ground Mount Assembly Alignment with Anchor Bolts Assembly Without a Crane Step6a Manual Lift 8a Ground Mount Assembly Base Hardware 8b Ground Mount Assembly Tiller Arm Hardware Motorizable Pedestal Ground Mount Assembly Step8d Ground Mount Assembly Tiller Arm Hardware 10 Waxing Bolts Manual Pedestal Ground Mount Assembly StepStep 13 Elevation and Azimuth Struts Step 17a Azimuth Strut Assembly Front 17b Azimuth Strut Assembly Rear 20 Bracket-Support Plates Top View 21a Elevation Strut Bracket 22a Manual Actuator Assembly Manual Actuator Assembly Step23 Azimuth Pivot Bracket Assembly 25a Jack Unscrew Procedure 26 Protective Boot Attachment 28a Elevation Jack Step 29b Left Side Frame Attachment Embedded Pipe Ground Mount Assembly Step29d Elevation/Azimuth Strut Assembly Step Elevation/Azimuth Strut Assembly29f Elevation Axis Weldment Attachment 29g Azimuth Strut/Pointer Attachment 29i Fine Azimuth Adjustment Attachment 30a Domestic Pack Reflector Unpacking Step30b Export Pack 31 Reflector Seam Alignment Step Assembly32 Seam Bolt Insertions Very Important 33c Alignment Bolt Insertions 34a Mounting Ring Placement 35a Mounting and Center Rings -35b Mounting and Center Rings Alignment Test Step Enclosure Pedestal Mount Only Step 38a Enclosure Final Assembly39a Enclosure Hardware Step 43 Safety Rope Tag Lines Reflector-to-Mount Assembly Using a Crane Step44b Crane Lift Without a Crane Step 46 Reflector to Mount 48 Enclosure Bracket Alignment Step 50a Reflector to Mount Reflector-to-Mount Assembly Embedded Pipe Ground Mount Step Subreflector Step 52a Subreflector Strut Assembly53a Subreflector Assembly 53c Subreflector Assembly 54a Subreflector Attachment Subreflector Struts Embedded Pipe Ground Mount Assembly Step Subreflector Adjustment Step Step Step Feed System Operation Overview Acquiring a Satellite StepPure Noise Signal on Spectrum Analyzer Step Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Operation Subreflector Adjustment Overview General Cleaning Electrical Parts Preventive MaintenancePreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Pedestal Mount Bearing Pad Adjustment Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Service Lube Quantity Andrew