True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
SHELVING INSTALLATION (COLD DELI)
SHELF INSTALLATION:
A.Lift each door up and out of track (do not dis- connect elastic tubing). Stretch elastic surgical tubing and set doors on each side of unit.
B.Locate brackets, lights, shelves, etc. from cabinet interior.
C.Locate shelf supports wrapped in micro foam and install teeth end into stainless pilasters located on interior walls. Adjust to desired height matching right and left pairs. (images 1 & 2).
D. Locate the stainless steel shelf and install with | 4 | |
| product stop towards the front of the cabinet. |
|
| Side flaps should overlap shelf support. Be sure |
|
| to fit shelf support tip into front slot of shelf |
|
| (images 2 & 3). |
|
E. | Plug light assembly into any receptacle of cabi- |
|
| net interior side wall (image 4). |
|
F. | Replace doors in track. |
|
NOTE
Three lighting receptacles allow for two additional, 1 "optional", lighted shelves.
WARNING
Shelf mounted lighting requires a closed circuit. All plugs must be plugged into side wall receptacles for lights to work. If less than three shelves are installed be sure attached caps are plugged into receptacle(s) (image 4).
➟
2
|
| 3 |
|
|
|
|
|
10 | www.truemfg.com | 10 |