5) Hang the Hood | Place the hood by sliding the round mounting holes in the top of the hood over the |
| top hood screws. Check and adjust for level. Tighten the screws |
|
|
1/4" (6 mm)
Figure 5: Hang the Hood
Install two lower hood screws from underneath.
|
| Figure 6: Install Lower Hood Screws |
6) | Connect to Ductwork | Connect hood to ductwork in house. |
7) | Connect Electric | Plug electrical cord into grounded outlet. Note: The hood requires a 120V AC, |
|
| 60Hz., 15A Branch Circuit. |
8) | Install Chimney | Remove protective film from both sections of chimney. |
|
| Connect the sections, one inside the other. For recirculation, the slots in the upper |
|
| chimney section should be at the end closest to the ceiling. When venting to the |
|
| outside, the top section can be turned upside down to conceal the vents. |
English 6