Broan RM51000, RM52000 manual Operation, Halogen Bulbs, Fuse Replacement, Controls

Page 10

OPERATION

Controls

The hood is operated using the slide controls under the bottom of the hood.

The light switch turns the lamps on and off.

The blower switch :makes it possible to select the motor operating speed. Position 0: motor off.

The pilot lamp lights up whenever the blower is on.

LIGHT

SWITCHBLOWER SWITCH

PILOT

LAMP

HALOGEN BULBS

This range hood requires two halogen bulbs (Type T4, 12V, 20W).

ALWAYS SWITCH OFF THE ELECTRICITY SUPPLY BEFORE CARRYING OUT ANY OPERATIONS ON THE APPLIANCE.

To change bulbs:

1.Loosen the ring nut by turning it counterclockwise.

2.Remove the bulb by pulling sideward(DO

NOT ROTATE). CAUTION: BULB MAY BE

HOT!

3.Replace with Type T4, 12V, 20W halogen bulb. Do not touch replacement bulb with bare hands!

RING NUT

FUSE REPLACEMENT

SWITCH OFFTHE ELECTRICITY SUPPLY.

Remove the decorative flue.

Open the fuse box.

Replace with the same type of fuse (5x20mm, 4A, 125V).

DECORATIVE FLUE

FUSE

BOX

FUSE

- 10 -

Image 10
Contents RM51000 RM52000 Series English Français EspañolPage Read and Save These Instructions Prepare the Hood Install Install the DuctworkInstall Mounting Bracket HoodWiring Mount the PlateDucted Configuration Connect DuctworkNon-ducted recirculation Configuration Hood Cleaning NON-DUCTED Recirculation Filter InstallationMaintenance Grease FiltersHalogen Bulbs Fuse ReplacementOperation ControlsWarranty BROAN-NUTONE LLC ONE Year Limited WarrantyLisez ET Conservez CES Instructions AvertissementsPreparez LA Hotte Installation Etrier D’ASSEMBLAGE Installation DU Systeme D’EVACUATIONDE Votre Hotte Installation DE LA Plaque Installation ElectriqueConnexion DU Systeme D’EVACUATION Modèle avec tuyau d’évacuationModèle recyclant l’air ’ÉTRIER DE Support AU Moyen DES VISFiltres anti-graisse Assemblage DU FiltreEntretien Filtre à charbonFonctionnement Remplacement FusibleCommandes Ampoules HalogenesGarantie Garantie BROAN-NUTONE LLC Limitée À UN ANLEA Y Conserve Estas Instrucciones AdvertenciaPrepare LA Campana Instalacion Soporte DE Montaje Instalacion DEL Tubo DEExtraccion Instalacion DEInstalacion DE LA Placa Instalacion ElectricaConfiguración con tubo Entubado DE CanalizacionDistancia de 5 12,5 cm alrededor del Filtros antigrasa Instalacion DEL FiltroMantenimiento Filtro al carbónSustitucion Fusible FuncionamientoLamparas Halogenas MandosGarantia Garantia BROAN-NUTONE LLC POR UN AÑOModels RM51000 RM52000 Service PartsDescription Modeles RM51000 RM52000 Liste Pieces DE RechangePart N Description Modelos RM51000 RM52000 Lista DE Piezas DE RecambioCÓD. N Pieza N Descripción Model RM51000 Model RM52000 Page 04306824/1