Blodgett SN-5G manual Lighting, Shutdown Stand by, Complete Shutdown

Page 13

WARNING: In the event a gas odour is detected, shut down equipment at the main shut off valve and contact the local gas company or gas supplier for service.

LIGHTING

1.Ensure power, gas and water supply is on.

2.Turn power switch “ON”.

3.Generator tank will begin filling with water.

4.Once water level has been reached, the ignition light should come on and remain on until ready light comes on.

5.Steamer is now ready for use.

SHUTDOWN

STAND BY

1. Set timer to “OFF” position and leave door slightly open.

COMPLETE SHUTDOWN

1.Set timer to “OFF” and turn power switch “OFF”. Generator will drain automatically.

2.Turn water supply “OFF”.

3.Turn gas supply “OFF”.

4.Disconnect power supply.

13

Image 13
Contents SN-5G, SC-7G and SC-10G Important Notes for Installation and Operation Table of Contents Water Quality Statement Service Connections SN-5GModel GAS Supply Service Connections SC-7G and SC-10GExhaust Fans and Canopies Installation GeneralWall Exhaust FAN To InstallClearances GAS Connection Drain Connections Figure VAC-60 Hz-Single PhaseWater Conditioning Cold Water CondenserPerformance Check Controls Operation InstructionsShutdown Stand by LightingComplete Shutdown Preparation Steam CookingPAN Number of Pans Depth SN-5G SC-7GPeriodic Maintenance Cleaning Monthly Weekly, or more often if necessaryNever Spray Water Into Electric Controls RUB with a Circular Motion Maintenance Stainless SteelTo Remove Heat Tint Removal of Scale DepositsUSE Deliming Procedure For units equipped with this featureBurner does not come on TroubleshootingBurner produces carbon deposits Door leaks Water flows into cooking compartmentWater accumulates in the compartment Water flows into drain during shut down