Zanussi ZGS 682 ICT manual Building over a cupboard or drawer

Page 21

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 3.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed. The space behind the kitchen unit ("b") can be used for connections.

Dimensions are given in mm.

2

1

3

21

Image 21
Contents GB IE Thank you for selecting our appliance Contents Installation Important Safety InformationPeople Safety During UseEnvironmental Information ServiceDescription of the Hobs Instructions for the User Lighting OperationBurner Minimum Maximum Diameter Using the hob correctlyPage Maintenance and Cleaning Hob TopPan Supports Ignition electrode BurnersSomething Not Working? Symptom SolutionEngineer technical data Instructions for the InstallerBurner Provision for Ventilation Important safety requirementsInstallation Gas Connection Location Fitting the Hob into Worktop Building Building over a cupboard or drawerBuilding over a kitchen unit with door Electrical Requirements Electrical ConnectionsPermanent Connection Wiring diagramPreliminary Electrical Systems Check Fault FindingEarth Continuity Check Ignition System / Gas Ignition Procedure Pressure TestingMinimum adjustment CommissioningMethod Conversion from Natural Gas to LPGExclusions Guarantee/Customer Service0870 5 929 Service and Spare PartsEuropean Guarantee Page Page Page Page 35699-4701 01/08 R.0