INSTALLATION INSTRUCTIONS
NOTE: It is good practice to :
Fit an Earth Leakage Circuit Breaker to your house wiring.
Wire your appliance to the latest IEE regulations.
THINGS TO NOTE
This appliance is designed to be fitted between cabinets with the recommended dimensions as shown in Fig. 3 & 4.
If there is an existing housing unit it must be removed.
The dimensions given provide adequate air circulation around the unit within the cabinet, ensuring compliance with BS
This appliance must not be installed on a wooden base board.
Enquiries regarding the installation of the cooker point, if required, should be made to your Regional Electricity Company to ensure compliance with their regulations.
The cooker point should be within 2m of the appliance to make it accessible to switch off the appliance in case of an emergency.
To protect the hands, wear gloves when lifting the oven into its housing.
NOTE: HOUSE CIRCUIT
Earth leakage / continuity tests must be carried out before the appliance is connected to the mains supply and
Fig. 3
Fig. 4
52