Maytag DGRSC, RJGR manual Component Testing Procedures

Page 13

Component Testing Procedures

!WARNING

To avoid risk of electrical shock, personal injury or death; disconnect power and shut off gas to unit before servicing, unless testing requires power.

Illustration

Component

Test Procedure

Results

 

Oven light housing

Disconnect connector and test

Verify bulb is plugged in properly.

 

 

resistance of terminals

Indicates continuity with bulb installed.

 

 

Measure voltage at oven light

12 VAC, see wiring diagram for

 

 

 

terminal identification.

 

 

 

If no voltage is present at oven light,

 

 

 

check wiring or light switches.

 

Rocker switch

Measure continuity of switch positions:

 

 

 

Closed

Continuity

 

 

Open

Infinite

 

Convection motor fan

Verify supply voltage

120 VAC

 

 

Check continuity of terminals, and

 

 

 

verify terminals are not shorted to

Approximately 80 Ω

 

 

chassis

 

Controls

Verify proper operation.

Open at 225°F, Closes at 165°F

 

 

 

 

Griddle thermostat

Verify supply voltage

120 VAC

Oven thermostat

Verify supply voltage

120 VAC

 

Pressure regulator

Verify gas pressure (WCP).

 

 

 

If on LP service, verify proper gas

5" Natural

 

 

10" LP/Propane

 

 

supply conversion.

 

 

Spark module

Test for voltage at terminals

 

 

4 + 0

L and N

120 VAC

GND

Input

Polarity and ground

Not subject to polarity

L or N

 

 

 

Holder orifice

Verify gas pressure (WCP).

 

 

 

 

5" Natural

 

 

 

10" LP/Propane

 

 

Check orifice for debris.

Clean as needed.

 

Spark ignition

Test for resistance of spark lead

Continuity

 

electrode

 

 

 

 

Test ignitor to chassis

No continuity from ignitor to chassis.

©2004 Maytag Services

16023219

13

Image 13
Contents Service Recognize Safety Symbols, Words, and Labels Customer Service Support CenterImportant Information Web Site Telephone NumberTable of Contents Recognize this symbol as a safety precaution Safety InformationOven Fires Servicing Safety Practices for ServicerReceiving Oven Using the Oven Delayed IgnitionCase of Fire Bake Burner FlameElectrical Requirements Connecting Range to GasExtension Cord GroundingOven Safety Valve Product Safety DevicesPressure Regulator Gas Burner OrificesGeneral Information Ordering Replacement PartsGeneral Information Parts and Accessories ServiceModel Identification Gas ValveTroubleshooting Procedures Problem Possible Cause Correction Component Testing Procedures Component Testing Procedures Removing and Replacing Unit Surface Burner Micro Switches Disassembly ProceduresControl Panel, Rocker Switches, and Indicator Lights Oven and Surface Broiler Infinite SwitchModules Removal Spark ModuleOven Light Socket Convection FanBake Gas Valves Broil Burner and IgnitorBackgaurd Top Side PanelDoor Removal Door DisassemblyGas Regulator Manifold PipeModule Type Front FacadeSurface Burner CharboilThis page is intentionally left Blank