Nuvo 250, 500 operation manual Doors Installation, Bottom Hinges

Page 11

STEP 7 : DOORS INSTALLATION

1 Insert DOORS onto

BOTTOM HINGES

2

3

4 2

5

6

4

2

5

3 6

4 2

5 3

6

4 2

5

3

6

4

2

5

3

6

4

5

6

2

3

4 2

5

3

6

4

2

5

3

6

4

2

5

6

4 2

5 3

6

4

2 5

3

6

5

6

1

2

2

Install TOP HINGES with HEX BOLTS (B)

D

NOTE : Adjust final position of the door

before tightening the bolts and

B

move cellar into place, leaving

 

4” clearance all around cellar.

 

MAKE SURE CABINET IS AIRTIGHT!

 

Adjust the level by turning

 

(counter clockwise) the LEGS (H)

 

as needed. Use a carpenter’s level.

~11~

Image 11
Contents Cellar nuvo 250/500 Test the Cooling Unit Read Before YOU StartArea for Assembling Your Wine Cellar ToolsHardware KIT Fully Panel PreparationDo not Step on Panels BAR Cabinet AssemblyNot Bang or Slap Panels Together Together HEX Bolts HINGE,BASE and Legs InstallationBase Hint ShelvesCoupler Hangers G Coupler S Helves Vertical CouplerDo not Cooling Unit InstallationLight Light and Light Cover InstallationBottom Hinges Doors InstallationController Action Display Example Operation Controls Plug IT in wait one minute and Enjoy110 19 Maximum Capacities and Loading TipsImportant Note Trouble Shooting GuideONE Year Limited Warranty Limited Warranty and Product SupportToll free