Nuvo 500, 250 operation manual Panel Preparation, Do not Step on Panels, Fully

Page 4

STEP 1 : PANEL PREPARATION

CAUTION :

1.Watch for sharp staples on boxes.

2.DO NOT STEP ON PANELS

3. The manual will give a recommended

order to open boxes, it saves time and space.

J

 

Open Boxes VP6 and VP7.

1

Install INSULATION STRIP (J) to

 

Back, Top, and Bottom Panels. PUSH

IN FULLY!

2Insert Cam Pins (F) in BACK PANEL’S predrilled holes down to TAB. (May require some force)

!CAUTION : DO NOT BREAK CAM PIN TABS! DO NOT HAMMER!

TAB TAB

BACK PANEL

F

3

Screw

 

in

both

 

 

screws

(C)

half

 

 

way

in

Coupler

 

 

Hanger (G) to back

 

 

panels and tighten

~4~

 

fully

when

both

screws are in.

J

PANEL EDGE

J

C

3

G

J

Image 4
Contents Cellar nuvo 250/500 Read Before YOU Start Area for Assembling Your Wine CellarTools Test the Cooling UnitHardware KIT Do not Step on Panels Panel PreparationFully Not Bang or Slap Panels Together Cabinet AssemblyBAR Together Base HINGE,BASE and Legs InstallationHEX Bolts Shelves Coupler Hangers GCoupler S Helves Vertical Coupler HintCooling Unit Installation Do notLight and Light Cover Installation LightDoors Installation Bottom HingesControls Plug IT in wait one minute and Enjoy Controller Action Display Example OperationMaximum Capacities and Loading Tips 110 19Trouble Shooting Guide Important NoteLimited Warranty and Product Support ONE Year Limited WarrantyToll free