STEP 4 : SHELVES
1Install COUPLER SHELVES between the VERTICAL COUPLER and the BACK PANEL, hook them on the
COUPLER HANGERS (G)
2Install 4 HANGERS STRIPS, hook- ing them to the COUPLER SHELVES through square holes. (Watch for orientation, all hooks have to point upwards).
NOTE : Assure that each of them is hooked to all 4 shelves
PRESS
TOP
BOTTOM
3
COUPLER SHELVES | 1 |
|
G
2
VERTICAL COUPLER
3 | Open box VP4S or VP4D | ||
Hook | SHELVES into hangers start- | ||
|
1
2
ing from the bottom of cabinet, (12 |
shelves on cooling unit side, 14 on |
the other) alternating the two sides |
HINT : |
CENTER SHELVES ON HANGERS
1Snap SHELVES into hangers on one side
2 Push the SHELVES down to snap into op- posite side hangers
~8~