Nuvo 250, 500 operation manual Cabinet Assembly, Not Bang or Slap Panels Together, Bar

Page 5

STEP 2 : CABINET ASSEMBLY

2

PANEL EDGE

CAM in LOCKED

POSITION

METAL

METAL

Use allen key provided or #3 phillips screwdriver.

1Attach TOP and Bottom to Back by CAREFULLY aligning edge holes over Cam Pins and gently push together to avoid damaging cam pins. DO

NOT BANG OR SLAP PANELS TOGETHER!!!

BOTTOM

PANEL

 

����

2Insert Cam, push all the way in under panel level (may

require some force) and make sure Arrow points to outside edge.

Gently push down to bring panels together before you tighten the Cam. Start with cams at each end.

Cam Arrow faces away from outside edge when tightened.

BOTTOM

PANEL

 

~5~

3

Insert Center COUPLER

 

BAR

by guiding edge

 

holes

over bottom

 

Cam Pins. Lightly push

 

out top panel edge to

 

allow Cam Pins to go in

 

Coupler Bar. Insert and

 

tighten Cams.

3

 

COUPLER

 

INSIDE

 

CABINET

BAR

 

Image 5
Contents Cellar nuvo 250/500 Area for Assembling Your Wine Cellar Read Before YOU StartTools Test the Cooling UnitHardware KIT Fully Panel PreparationDo not Step on Panels BAR Cabinet AssemblyNot Bang or Slap Panels Together Together HEX Bolts HINGE,BASE and Legs InstallationBase Coupler Hangers G ShelvesCoupler S Helves Vertical Coupler HintDo not Cooling Unit InstallationLight Light and Light Cover InstallationBottom Hinges Doors InstallationController Action Display Example Operation Controls Plug IT in wait one minute and Enjoy110 19 Maximum Capacities and Loading TipsImportant Note Trouble Shooting GuideONE Year Limited Warranty Limited Warranty and Product SupportToll free