Woods Equipment TCH4500 manual Rear Drive Belt, Front Belt Installation

Page 20

Front Belt Installation

1.Place belt around both sheaves.

2.Attach idler pulley to idler bracket using hardware previously removed.

3.Tighten eyebolt until belt deflection is 7/16" when a 20 lb load is placed against the belt. See Figure 9.

7/16" Deflection

Force

20 lb

LA4

Figure 9. Belt Tension

4.Attach bearing support weldment to the chipper housing using hardware previously removed.

5.Attach belt shield to the chipper housing using hardware previously removed.

Rear Drive Belt

Rear Belt Removal

1.On a hard, level surface lower chipper with 3-point lift arms to the ground.

2.Move engagement lever to the RELEASE (up) position.

3.Disconnect drive shaft, 3-point lift arms, and top link from tractor.

4.Place drive shaft in storage position up off the ground.

5.Remove rear belt shield from the chipper housing and save hardware.

6.Loosen the eyebolt to release tension on the belt.

7.Remove hardware and idler pulley from idler weldment. Save hardware.

8.Remove hardware securing idler weldment to chipper housing and move idler weldment out of the way. Save hardware.

9.Remove old belt from around both sheaves.

Idler

 

Idler Pulley

Weldment

 

 

 

 

 

Belt

Eyebolt

DP3

Figure 10. rear Belt Assembly

Rear Belt Installation

1.Place belt around both sheaves.

2.Attach idler weldment to chipper housing using hardware previously removed.

3.Attach idler pulley to idler weldment using hardware previously removed.

4.Tighten eyebolt until belt deflection is 7/16" when a 20-lb load is placed against the belt. See Figure 9.

5.Attach rear belt shield to the chipper housing using hardware previously removed.

20 Service

MAN0458 (9/23/2005)

 

 

Image 20
Contents Operators Introduction To the DealerTable of Contents LEA EL InstructivoSpecifications General InformationSafety Safety RulesTraining PreparationMaintenance TransportationStorage Safety Safety & Instructional DecalsShield Missing Safety Be Careful Operation OperationChipper PRE-OPERATION Attaching Chipper to TractorTractor Stability Starting the ChipperStopping the Chipper Clearing Plugged DiskCleaning Operating TechniqueStoring Chipper After Each UsePRE-OPERATION Check List Owners ResponsibilityService ServiceService and Maintenance Schedule LubricationInstall Disk Lock Chipper BladesBlade Installation Blade ServicingBlade Removal & Cutting Edge Reversal Blade InspectionDrive Belt Adjustment Blade ClearanceDrive Belt Front Drive BeltFront Belt Installation Rear Drive BeltTroubleshooting TroubleshootingTroubleshooting Assembly Assembly InstructionsInstall 3-POINT Hitch Pins Install Chipper HopperHinge Latch Installed Install SMV Sign Install Discharge Tube OptionalShorten Driveline Dealer Check Lists Dealer Check ListsPRE-DELIVERY Check List Delivery Check ListTCH4500 Base Assembly PartsTCH4500 Base Assembly Parts List PartsChipper Upper Assembly TCH4500 Chipper Upper Assembly Parts List TCH4500 Chipper Hopper Assembly TCH4500 Chipper Hopper Assembly Parts List TCH4500 Discharge Tube KIT OptionalTCH4500 & 5000 Chipper Driveline Assembly Bolt Torque Chart SAE Series Torque ChartAppendix Metric SeriesBolt Size Chart AbbreviationsWarranty Woods Equipment Company