1.Fill CV double yokes with 20 pumps of grease with the joints in a straight line.
2.Articulate CV body to maximum angle several times to ensure full coverage of joints.
3.Place joints in the straight position and add 10 additional pumps of grease to both joints.
4.Wipe telescoping drive clean of all old grease and contaminants.
5.Add a thin layer of new grease over telescoping drive.
REF | DESCRIPTION | FREQUENCY |
1. | Driveline | 8 Hours |
2. | Telescoping Shaft | 8 Hours |
3. | CV Body | 8 Hours |
4. | Shield Bearing | 8 Hours |
5. | Splitter Gearbox (Fill 1/2 | Check |
| full w/SAE 90W gear lube Daily | |
6. | Rear Deck Pivot Arm | 8 Hours |
7. | Transport Wheel Hub | 8 Hours |
Figure 2. Trailer Lubrication Points
REF | DESCRIPTION | FREQUENCY |
1. | Driveline | 8 Hours |
2. | Telescoping Shaft | 8 Hours |
3. | Shield Bearing | 8 Hours |
4. | Gearbox (Fill 1/2 | Check |
| full w/SAE 90W gear lube Daily | |
5. | Caster Wheel Hubs | 8 Hours |
6. | Caster Pivots | 8 Hours |
7. | Blade Spindles | 40 Hours |
8. | Wing Pivot | 8 Hours |
9. | Deck Pivot | 8 Hours |
|
|
|
Figure 3. Deck Lubrication Points
MAN0765 (12/5/2008) | Owner Service 19 |
|
|