OPERATION

OPERATION

FILLING BUCKET

Control the bucket attitude throughout the digging cycle to keep teeth at the proper angle for best penetration. This will minimize dragging and scraping the bucket through the ground.

When digging in hard-packed soil, bucket penetration can be increased by applying down pressure with the boom while crowding in and curling the bucket. If the crowd action “stalls”, it may be necessary to apply lift occasionally during the digging cycle to correct the bucket depth.

DUMPING BUCKET

To dump the bucket at the end of the digging cycle, lift the bucket clear of the trench while crowding it out and swinging it to the spoil pile.

As the pile is approached, dump the bucket. When the bucket is empty, the dipstick and bucket are in position to resume digging upon return to the trench.

IMPORTANT: Avoid constant jarring or hammering-type contact between the spoil pile and the loaded bucket as this may cause premature wear to the backhoe pin and bushings.

TRENCHING BETWEEN A BUILDING & OPEN EXCAVATORS

Start the trench at the building. Trench out halfway to the excavation. Then, start trenching from the excavation to the first trench. Dig toward the first trench until there is just enough room to move the unit out from between the two trenches.

To obtain a cleaner trench and avoid the build-up of material directly in front of the backhoe, crowd out and completely curl the bucket while starting to lift it from the excavation. In this way, excess material will fall back into the excavation.

F-4139 01/11

Operation Section 3-4

© 2011 Alamo Group Inc.

Image 32
Contents 60C To the OWNER/OPERATOR/DEALER Table of Contents Page Safety Section Safety SG-4 Safety Safety Equipment Operation Safety Instructions and Practices Safety Safety Safety SBH-1 Transporting Safety Instructions and Practices Safety Storage Safety Instructions and Practices Parts Information See Your Rhino DealerDecal Location QTY Level Description Decal Description 4139 01/11 Safety Section Federal Laws and Regulations Page Introduction Section Introduction Cylinder Data General DataBucket Data Introduction Operation Section PRE-OPERATION Checklist Operating DirectionsEngine Speed ControlsOperating Backhoe Left Hand StabilizerRight Hand Stabilizer Trenching Between a Building & Open Excavators Filling BucketDumping Bucket Opposite side of the trenches Side Slope Excavating or TrenchingSeat Adjustment MiscellaneousBackfilling Finishing Straight WallsMounting and Dismounting Buckets Placing the StabilizersBoom Lock Stabilizer LockTransporting the Backhoe Removal from Tractor StorageMaintenance Section Cylinder Assembly Cylinder ServiceCylinder Disassembly Hydraulic System Reservoir Beginning of SeasonHydraulic Hoses Lubrication Chart Bucket Tooth PointsTightening Nuts and Bolts LubricationHydraulic Troubleshooting Maintenance Valve Service Main Relief ReplacementSpool Seal Installation Torque SettingsMaintenance Parts List Description QTYProper Torque for Fasteners Page Rhino Required of the Owner 60C-SOM-01/11 F-4139C Printed U.S.A