OPERATION
Position the unit so the backhoe swing post is over | Level the backhoe on slopes with the stabilizers to dig |
the center line of the trench connection. Dig with the | plumb trenches, or use the backhoe or loader to cut a level |
backhoe at extreme swing positions, and in as close | slot for the uphill wheel and stabilizer. Pile the slot on the |
to the stabilizers as possible. Pile the soil on the | low side. |
opposite side of the trenches. |
|
| When on the side of a steep slope, cut a level surface |
| along the uphill side of the trench with the loader. |
Position the unit forward with the lift and crowd levers so | Pile the spoil of the cut downhill. When digging, pile the |
the two trenches can be connected. Pile the spoil on the | spoil of the trench uphill. |
opposite side of the trench. |
|
Dig field trenches progressively. As soon as one trench is completed, have the work men lay the tile. Start the next trench, using the spoil to fill the previous trench.
SIDE SLOPE EXCAVATING OR TRENCHING
Dig with the backhoe uphill whenever possible.