Multiquip MLT25 operation manual Awg

Page 48

wiring diagram (sheet 2)

L+ M I1 I2 I3 I4 I5 I6 I7 I8

12/24 VDC

I1,

I2

=

A

I3,

AI4

(0..10V)

INPUT 8x DC

I7,

I8

=

A

I1,

AI2

(0..10V)

 

 

DEC SmartRelay

 

 

 

 

 

 

 

 

 

 

ESC

 

ESC

 

 

FL1E-H12RCE

 

 

 

 

 

 

 

 

 

 

 

X

9

 

 

 

 

OUTPUT 4X RELAY /10A

10 11

 

 

 

3

1

2

1

2

1

2

1

 

2

 

Q1

 

Q2

Q3

 

Q4

AWG

 

 

 

 

 

 

 

 

 

GRAY/RED 16 AWG

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

TO CB1 L2

 

 

 

 

 

 

 

 

RED

SEE SHEET 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BLK/ORG 16 AWG

 

 

 

3Ø PRESENT

 

 

 

 

K6

 

 

 

BRN/BLUE 18 AWG

8

12

RED 18 AWG

 

 

 

 

 

 

 

NO

 

 

AWG

 

AC VOLTAGE

 

 

18

 

 

 

 

TRANSDUCER

 

BRN/YEL

 

 

7

+12VDC

AC IN (NEU) 3

 

 

5

 

 

 

 

6 GND. (-DC)

 

4

 

 

 

 

 

 

8 0-10 VDC OUT

2

 

 

 

 

 

9

 

AC INPUT (L3) 1

 

 

 

 

 

 

 

 

 

GRAY/BLUE 16 AWG

 

 

4

 

 

 

 

WHT 16 AWG

13

 

14

 

 

 

 

 

 

 

K6

GRAY 16 AWG

 

 

 

 

 

 

WHT 16 AWG

 

 

 

 

 

 

 

 

NEUTRAL BUS

TO CB1 L3

GRAY/BLUE 16 AWG

 

SEE SHEET 1

RED/PINK 16 AWG

 

OIL PRESSURE

BLK16 AWG

 

GAUGE TERMINAL “G”

 

(GROUND)

SHIELD

 

TB1 E1

WHT 16 AWG

OIL PRESSURE

A1

 

 

A2

 

 

 

 

GAUGE TERMINAL “I”

1

R3

R5

7

(IGNITION)

K1

 

 

 

 

 

 

 

 

1

 

 

 

 

1

R4

R6

8

 

1Ø 120V

 

RED16AWG

RED/GRAY

 

16 AWG

 

 

 

 

K3

A1

 

 

A2

 

L1

L2

L3

L4

K5

T1 T2 T3 T4

3Ø 120V

RED/BLUE

16 AWG

WHT 16 AWG

A1 A2

L1 L2 L3 L4

T1 T2 T3 T4

3Ø 277V

RED 16 AWG

A1

 

 

A2

K2

 

 

 

L1

L2

L3

L4

2

 

 

 

T1

T2

T3

T4

3Ø 120V

 

RED 16 AWG

 

A1 A2

K4

L1

L2

L3

L4

T1

T2

T3

T4

3Ø 277V

RED 16 AWG

NOTES:

1K1 CONTACTOR (ABB) AF09Z-22-00-20

2K2-K5 CONTACTORS (ABB) AF09Z-40-00-20

PROGRAMMABLE LOGIC CONTROLLER

3FOR REPLACEMENT CONTACT MQ PARTS DEPT.

4WIRE COLOR CODE IS BASE COLOR/STRIPE

page 48 — MLT25 sERIES LIGHT TOWER • operation manual — rev. #0 (11/28/12)

Image 48
Contents Model MLT25 sERIES Proposition 65 warning Reporting Safety Defects NhtsaTable of Contents Specifications are subject to change without noticeSafety Information SaFeTY MessagesSaFeTY sYMBOLs Addresses practices not related to personal injuryGeneRaL saFeTY LIgHT TOWeR saFeTY LaMp saFeTYTOWIng saFeTY TRanspORTIng saFeTY Loading and Tie-Down on Flatbed TruckELeCTRICaL saFeTY „ neveR operate light towerMLT25 Series Specifications Light Tower SpecificationsTrailer Specifications Generator/Engine SpecificationsDimensions DimensionsReference Letter Description Dimension Length Mast Stowed Position Length Mast Deployed PositionGeneral information Metal Halide LampsComponents Major Components Control Panel SideCircuit Breakers, 3-Pole, 15 a Turn the lamps on and off Major Components Front/RearRead all safety instructions at the beginning of manual InspectionBefore starting Check all fastening nuts and bolts for tightnessContact between the two connectors Female and Male ConnectorOperation Starting the EngineMast operation Outriggers and Support StandsRaising the Mast Raising the Mast Lowering the MastStowing the Mast to Horizontal Position Rotating the MastMove the Voltage Selector to the desired position Voltage Selector PositionsMaintenance Generator/ENGINE MaintenanceCheck Cable Wear Servicing the Mast Raise/Lower Cable SystemServicing the Mast Extension Cable System Lower the mast to the horizontal resting positionMaintenance Trailers Manually Adjusting the BrakesTrailer Brakes Hydraulic BrakesAdjustable Channel Hydraulic Brake TroubleshootingWheel Hub Adjustment Leaf SuspensionSafety guidelines Trailers COMMOn Causes for LOss of TRaILeRTRaILeR TOWIng guIDeLInes DRIvIng COnDITIOns COupLIng to THe TOW veHICLeInOpeRaBLe BRaKes, LIgHTs or MIRRORs TRaILeR TOWIng TIpsTRaILeR vIn Tag ELeCTRICaL COnneCTOR TOW veHICLeSuspensIOn sYsTeM BRaKe COnTROLLeRSaFeTY CHaIns TRaILeR LIgHTIng anD BRaKIng COnneCTORBReaKaWaY sYsTeM JaCKsTanDLock washer and hitch frame Trailer tongue. Wood or concrete blocks may also be usedCoupling the Trailer to the Tow vehicle Ball Coupler Attaching safety Chain Breakaway Brake systemBreakaway Cable surge Brake system Connecting Trailer Lights Uncoupling the Ball HitchPInTLe Hitch COupLeR Pintle Coupler and pintle HookFigure H. Attaching Safety Chain Pintle Hitch Coupling Trailer to Tow vehicle pintle CouplerTIRe saFeTY Unsafe Tires, Lug nuts or Wheels Determining Load Limit of TrailerBe sure lug nuts are tight before each tow Step Determining Load Limit of Tow vehicle stepTIRe FunDaMenTaLs Table a. speed RatingLetter Rating Speed Rating Tire safety Tips Tire RepairReplacing Worn or Damaged Tires Uniform Tire Quality grading standards uTQgsTable B. Tire Wear Troubleshooting Wheel RimsWheels, Bearings and Lug nuts Lug nut Torque RequirementsLights and signals Table C. Tire Torque RequirementsLamp Troubleshooting Symptom Possible Cause SolutionWhen switch is first Checking voltage and ballast Turned on Replacement minimizes color differencesClean fixture Lamp starts slowly ARC does not strike Defective Lamp?Lamp Troubleshooting Guide ConnectionsBallast Removal StartingElectronic components locator Wiring diagram sheet L3 NEU. GNDTB1 E1 AWG Page HERE’S HOW to GET Help