Guardian Technologies 004725-1, 004725-3 Control Console Components, Weekly Exercise Cycle

Page 15

Section 3 - Operation

Guardian Liquid-cooled 15 kW, 20 kW and 25 kW Generators

3.2CONTROL CONSOLE

COMPONENTS

The components of a liquid-cooled generator control console (Figure 3.1) are as follows:

Figure 3.1 - Liquid-Cooled Generator Panel

‹3.2.4 15 AMP FUSE

The fuse protects the control console’s DC control circuit against electrical overload. If the fuse has melted open because of an overload, engine cranking and startup cannot occur. If replacement of the fuse is necessary, use only an identical 15-amp fuse. (Type AGC, part number 022676).

 

FUSE

FAULT

HOUR METER

15-A

INDICATOR

 

AGC

 

AUTO

 

 

 

 

SET

OFF

 

EXERCISE

 

TIME

 

 

 

 

ON

MANUAL

 

 

‹3.2.1 HOURMETER

Indicates time the engine-generator has operated, in hours and tenths of hours. Use the hourmeter along with the periodic maintenance schedule for the gen- erator set.

‹3.2.2 AUTO/OFF/MANUAL SWITCH

Use this three-position switch as follows:

Set the switch to AUTO for fully automatic opera- tion. See “Automatic Operation”, Section 3.4.

Set switch to MANUAL position to crank and start the generator engine.

Set switch to OFF position to shut down an oper- ating engine. With OFF selected, operation will not be possible.

DANGER

With switch set to AUTO, engine can crank

!and start suddenly without warning. Such automatic start up normally occurs when utili- ty source voltage drops below a pre-set level. To prevent possible injury that might be caused by such sudden starts, set AUTO/OFF/MANUAL switch to OFF before working on or around the unit. Then, place a "DO NOT OPERATE" tag on control console.

‹3.2.3 FAULT INDICATOR LAMP

The lamp goes ON when one or more of the following engine faults occurs and when engine shuts down.

• Low oil pressure

Overcrank

• High coolant temperature

Overspeed

• Low coolant level

 

 

‹3.2.5 7.5 AMP INLINE FUSE

This inline fuse is connected in the 15A line that runs between the AUTO/OFF/MANUAL switch and position 10 of the 76009A PCB. This fuse protects the start, fuel, field boost, and transfer outputs from the PCB and will open if there is excessive current draw on any one of these outputs.

NOTE:

This fuse will not remove the positive (+) battery input power from the PCB when it opens. This means the exercise timer will not be reset. If this fuse does open, carefully check the wiring to the start, fuel, field boost and transfer outputs before replacing the fuse.

‹3.2.6 SET EXERCISE TIME SWITCH

This switch allows for programming the generator to start and exercise automatically. See “Weekly Exercise Cycle” (Section 3.5).

3.3MANUAL TRANSFER AND

START-UP

To transfer electrical loads to the STANDBY (GEN- ERATOR) power source side and start the engine manually, refer to the Owner’s Manual of the particu- lar transfer switch.

3.4AUTOMATIC OPERATION

To set the system for fully automatic operation, pro- ceed as follows:

Check that load circuits are connected to the utility power supply.

Set the AUTO/OFF/MANUAL switch to its AUTO position.

Set the generator main circuit breaker to its ON or CLOSED position.

3.5WEEKLY EXERCISE CYCLE

The generator will start and exercise once every seven days. During this weekly exercise, the unit runs for about 20 minutes and shuts down. Transfer of loads to generator output does not occur during the exer- cise.

To select day and time for exercising, proceed as follows:

Generac® Power Systems, Inc. 13

Image 15
Contents Liquid-cooled, Prepackaged Standby Generators Introduction Authorized Service Dealer Location‹ Operation and Maintenance ‹ HOW to Obtain ServiceIntroduction IFC Safety Rules General Hazards Electrical Hazards Generator AC Connection Systems Transfer SwitchGenerator Automatic System OperationEngine Protective Devices ‹ 1.7.1 LOW OIL Pressure Switch‹ 1.7.2 High Coolant Temperature Switch ‹ 1.7.3 LOW Coolant Level SwitchLifting the Generator Unpacking‹ 1.10.2 Engine Specifications SpecificationsReconfiguring the Fuel System ‹ 1.10.1 Generator SpecificationsTorque Specifications Engine OIL RecommendationsCoolant Recommendations ‹ 2.1.1 Nfpa Standards Generator LocationGenerator Mounting Support Basic Standby Electric SystemGrounding the Generator Transfer Switch Start Signal ConnectionsEmergency Circuit Isolation Method Total Circuit Isolation Method‹ 2.11.1 Prior to Initial START-UP Battery InstallationPreparation Before START-UP ‹ 2.10.1 Vented BatteriesUsing a Standard GTS Transfer Switch Control Console Components Manual Transfer START-UP Automatic OperationWeekly Exercise Cycle Once Annually Engine HeaterEvery Three Months Once Every SIX MonthsCooling System Checking Fluid LevelsOverload Protection for Engine DC Electrical System ‹ 4.5.4 Inspect Cooling System ‹ 4.5.2 Check Battery‹ 4.5.1 Check Engine OIL Level ‹ 4.5.3 Exercise System‹ 4.5.13 Coolant Change Miscellaneous Maintenance‹ 4.5.11 Changing the Engine AIR Cleaner ‹ 4.6.1 Cleaning the Generator‹ 4.6.4 Battery Replacement ‹ 4.6.3 Battery MaintenanceService Maintenance Interval Information Scheduled MaintenanceLevel Maintenance Level Problem Cause Correction Troubleshooting PointsGuardian Liquid-cooled 15 kW, 20 kW and 25 kW Generators Guardian Liquid-cooled 15 kW, 20 kW and 25 kW Generators Installation Diagram Section Electrical Data Customer Connection 120/240V 1-PHASE Electrical Data ASM Motor Stepper Housing Governor ConnectorConnector Interface Assembly Cover Connector HousingWasher Flat 5/16 Zinc Base Mounting 1.5L Stnrd & AcstcWasher Shakeproof EXT 5/16 STL Dampener VibrationWeld Stud Under Roof Panel for Access Cover Cable Cover Access GEN Assembly BASE-DOOR Ground WireGRD Wire Assy 99HSB Assembly Cover AccessWeld Stud Under Roof For Access Cover Cable Baffle Cntrl PNL 1.5L Acoustic Roof Acstc & Stnd Cmprtmnt 1.5LDoor Weldment 1.5 EPS Washer Self Locking DomeTo a Holder Fuse Wire AssemblySilksc HourmeterWaterpump Hardware Clamp for Wiring Harness not Shown Switch OIL PressureARM Adjust Alternator Ground Wire Starter16 7 Guard FAN 1.5L Modine Tank Coolant RecoveryRadiator 1.5L Venturi 1.5L ModineVapor Flange Fuel Inlet Cover AIR CleanerGasket AIR Cleaner Adapter Weldment Mounting Base16 30 21 Assy Rotor 20KW Housing BlowerAssy Rotor 10KW Assy Rotor 15KWBattery Post Cover RED+ ASSY,WIRE#16 REDBOOT, Battery Cable BRACKET, Battery Hold DownPIPE,EXHAUST 1.5L STNDRD&ACSTC Manifold Exhaust 1.5LNipple TOE 1.5NPTX5.5 BLK Iron Saddle 2 InchYour Warranty Rights and Obligations MANUFACTURER’S Emission Control System Warranty CoveragePURCHASER’S/OWNER’S Warranty Responsibilities Emission Related Parts Include the Following Emission Control System WarrantyWarranty Schedule