19th Century™
CEILING HARDWARE
CROSSBAR | WIRE NUT (4) |
MOUNTING |
|
BRACKET |
|
ADDITIONAL HARDWARE
21/4” x
1” x | FLAT WASHER (2) | |
HEAD SCREW (2) | ||
|
SUPPORT INSTALLATION PARTS
LAG SCREW |
| LARGE |
| FLAT WASHER | |
3/8” #7 X 5” (1) |
| |
| 3/8” (1) |
CROSSBAR MOUNTING BRACKET INSTALLATION
Note: After removing the old fixture, check the outlet box to insure that it is supported by a joist or beam across its upper surface. If not, a 2” x 4” stud must be installed.
Step 1. Remove the knockout plug in the center of the outlet box or drill a 1/2″ hole for the lag screw to pass through. Then drill a 1/4″ guide hole into the joist or beam to a depth of 3″.
Step 2. Route the outlet box wires through the keyhole slot of the crossbar mounting bracket as shown. Attach the crossbar mounting bracket to outlet box with screws provided, assuring that the outlet box wires are not pinched by the washer.
CAUTION: To reduce the risk of personal injury, use only the mounting hardware provided with the approved outlet box to install the crossbar mounting bracket.
WARNING!
SUPPORT DIRECTLY TO
BUILDING STRUCTURE ONLY.
JOIST
CEILING FAN |
|
APPROVED | CEILING |
WIRING BOX | WIRING |
CROSSBAR | RIDGE |
MOUNTING | SIDE |
BRACKET | DOWN |
GREEN GROUND
FLAT WIRE WASHER
APPROVED
OUTLET BOX
HARDWARE
5