Aruba Spa 2003 Serenade manual Start-Uppreparations, Do not run the pump until the spa is full of

Page 11
START-UP PREPARATIONS

supply service panel with a continuous copper wire equiva- lent in size to the circuit conductors supplying this equip- ment.

3.At least two lugs marked “Bonding Lugs” are provided on the external surface or inside the supply terminal box. To reduce the risk of electric shock, connect the local common bonding grid in the area of the spa to these terminals with an insulated or bare copper conductor not smaller than #6 AWG.

4.All field installed metal components such as rails, ladders, drains or other similar hardware within 3 meters of the spa shall be bonded to the equipment grounding bus with cop- per conductors no smaller than #6 AWG.

5.Save these instructions.

START-UP PREPARATIONS

Before performing the operations in this section, make sure you have read and understood all of the previous instruc- tions set forth in this manual. Make sure the spa has been installed correctly, including electrical wiring connections as specified in the previous sections. The following procedures must be done in the order they are listed.

WARNING

Do not run the pump until the spa is full of

water. Running the spa pump without water could cause damage to the operating system and void the warranty.

Things to check before turning on the power to the spa:

1)Make sure the spa is clean, and that there is no foreign material in the spa.

WARNING

Unions must be hand tightened before fill- ing the spa with water. Failure to do so may cause the unions to leak, which can damage the spa pack, and voids the warranty.

9

Image 11
Contents ARUBA SPAS Box 2266 Station R Kelowna, BC V1X 4K6 TABLE OF CONTENTS HAZARD INTRODUCTIONDear Aruba Customer HOW YOUR ARUBA SPA IS BUILT GETTING STARTED ITEMS REQUIRED FOR THE INSTALLATION OF YOUR SPA TOOLS REQUIRED FOR INSTALLATIONusing your IMPORTANT SAFETY INSTRUCTIONSHAZARD these safetyPOSITIONING YOUR SPA YARD INSTALLATIONDECK INSTALLATION INDOOR INSTALLATION GND N L1 L2 ELECTRICAL CONNECTION ACCESSIMPORTANT SAFETY INSTRUCTIONS ELECTRICAL CONNECTIONDo not run the pump until the spa is full of START-UPPREPARATIONSPump INITIAL START-UPKnife Valve #1 Knife Valve #240 CELSIUS 104 F This system should be set to maintaina water temperature NO GREATER THAN Invert Button SPA OPERATIONS GUIDETopside Control Component Identification Heat s and Heat t buttonsCELSIUS OR FAHRENHEIT Pump buttonLight Filter Cycle Programmingair flow may be restricted HYDROTHERAPY JETSMicro Directional All jet trim kits must be properly seated orSwirl Jet Cluster JetsMassage Jet This system only accepts a 220v Ozonator OZONATORS-OPTIONALIt is necessary to use Chlorine or Bromine chemical treatment with an ozonatorTROUBLE SHOOTING Display flashes FLO FLOW CHEMICAL MAINTENANCE INITIAL START UP PROCEDURES Sanitizers such as Sodium WATER MAINTENANCE SCHEDULECONDUCTING PROPER WATER TESTS WeeklyBROMINE High pH CHEMICAL TABLE OF EQUIVALENTS CHARTPROBLEMS ASSOCIATED WITH IMPROPER WATER BALANCE Low pHTo drain the spa CARE FOR YOUR SPADRAINING YOUR SPA Causes of pH changeat least once every six months FILTER CLEANINGSPA SURFACE Make sure you replace your filter cartridgescleaners CABINETCOVER When cleaning the surface use only acrylicFading and discolouration SPECIAL COLD WEATHER INSTRUCTIONS 1-877--877-2087 WARRANTY INFORMATIONand its exclusions For warranty service contact a Smart Protect Warranty service agent atL I M I T E D FIVE YEAR LIMITED NO LEAKONE YEAR LIMITED SKIRT WARRANTYREGISTRATION To validate this warranty, the original purchaser must complete the warranty registration card and mail it to ARUBA SPAS within 30 days of deliv- ery of the spa P Spa comes on by itself TROUBLE SHOOTING GUIDEPROBLEM DIAGNOSIS ACTION P Spa won’t turn onP Abnormal water usage P Water not cleanP Motor shuts down while in use P GFCI shuts down frequentlyP Scale deposits P pH is too lowP Formation of chloramines P Foaming of waterOptional Purchase CIRCULATION PUMP OPERATIONSDATE WEEKLY MAINTENANCE SCHEDULEClean Maintenance920 Leathead Road Kelowna, BC V1X 2J8