TOOLS REQUIRED FOR INSTALLATION
•Voltmeter
•Ammeter
•Ohmmeter
•Screwdrivers (Phillips & flat head)
•2 wire restrainers
•Wire cutters
•Wire strippers
•#6 AWG 3 wire Chg: (plus ground) if spa is more than 30ft from the Main Breaker Box.
ITEMS REQUIRED FOR THE
INSTALLATION OF YOUR SPA
•At least four people are required at time of delivery to place your spa into position.
•220 Volt Electrical Service
•An Electrician to do the electrical connection.
•50 Amp GFCI circuit breaker. (see page 8)
•An Allen Key to open and remove the access panel. (sup- plied by Aruba Spas)
4