Aruba Spa 2003 Escape manual Pump button, Light, Filter Cycle Programming, Celsius Or Fahrenheit

Page 15
Pump button

Pump button

The control panel button designated “PUMP” activates the pump when pressed. The pump sequence is low speed, high speed, off. The pump, when the “PUMP” button is manual- ly pressed, turns off after thirty minutes (a thirty-minute default).

NOTE: You will not be able to turn off your pump if your spa is in a filter cycle, heating, or in freeze protection (less than 52°F).

Light

The control panel button designated “LIGHT” activates the spa light when pressed. The light turns off after two hour (a two-hour default).

Filter Cycle Programming

Proper filtration is an important key to maintaining the clar- ity of your spa’s water. The filter system is designed for unsurpassed effectiveness at removing debris and suspen- sions from the water while the water is circulating.

By pressing the Heat key and the Program key at the same time, you can adjust your filtration cycle from the factory set- ting of 2 hours every 12 hours, in 1-hour intervals.

NOTE: If the water temperature does not drop the internal timer still operates the filter cycle to ensure proper filtration.

CELSIUS OR FAHRENHEIT

By pressing the Program key and the Light key at the same time you can change the degree settings from Celsius to Fahrenheit or vise versa.

AIR CONTROLS

There are two air controls beside the topside control panel. By turning these controls you may adjust the amount of air going to the jets. When fully open you are getting the maxi- mum amount of air for full hydrotherapy action. To reduce the amount of air coming out of the jets simply close the air controls.

13

Image 15
Contents ARUBA SPAS Box 2266 Station R Kelowna, BC V1X 4K6 TABLE OF CONTENTS INTRODUCTION Dear Aruba CustomerHAZARD HOW YOUR ARUBA SPA IS BUILT GETTING STARTED ITEMS REQUIRED FOR THE INSTALLATION OF YOUR SPA TOOLS REQUIRED FOR INSTALLATIONusing your IMPORTANT SAFETY INSTRUCTIONSHAZARD these safetyYARD INSTALLATION DECK INSTALLATIONPOSITIONING YOUR SPA INDOOR INSTALLATION GND N L1 L2 ELECTRICAL CONNECTION ACCESSIMPORTANT SAFETY INSTRUCTIONS ELECTRICAL CONNECTIONDo not run the pump until the spa is full of START-UPPREPARATIONSPump INITIAL START-UPKnife Valve #1 Knife Valve #2This system should be set to maintain a water temperature NO GREATER THAN40 CELSIUS 104 F Invert Button SPA OPERATIONS GUIDETopside Control Component Identification Heat s and Heat t buttonsCELSIUS OR FAHRENHEIT Pump buttonLight Filter Cycle Programmingair flow may be restricted HYDROTHERAPY JETSMicro Directional All jet trim kits must be properly seated orCluster Jets Massage JetSwirl Jet This system only accepts a 220v Ozonator OZONATORS-OPTIONALIt is necessary to use Chlorine or Bromine chemical treatment with an ozonatorTROUBLE SHOOTING Display flashes FLO FLOW CHEMICAL MAINTENANCE INITIAL START UP PROCEDURES Sanitizers such as Sodium WATER MAINTENANCE SCHEDULECONDUCTING PROPER WATER TESTS WeeklyBROMINE High pH CHEMICAL TABLE OF EQUIVALENTS CHARTPROBLEMS ASSOCIATED WITH IMPROPER WATER BALANCE Low pHTo drain the spa CARE FOR YOUR SPADRAINING YOUR SPA Causes of pH changeat least once every six months FILTER CLEANINGSPA SURFACE Make sure you replace your filter cartridgescleaners CABINETCOVER When cleaning the surface use only acrylicFading and discolouration SPECIAL COLD WEATHER INSTRUCTIONS 1-877--877-2087 WARRANTY INFORMATIONand its exclusions For warranty service contact a Smart Protect Warranty service agent atL I M I T E D FIVE YEAR LIMITED NO LEAKONE YEAR LIMITED SKIRT WARRANTYREGISTRATION To validate this warranty, the original purchaser must complete the warranty registration card and mail it to ARUBA SPAS within 30 days of deliv- ery of the spa P Spa comes on by itself TROUBLE SHOOTING GUIDEPROBLEM DIAGNOSIS ACTION P Spa won’t turn onP Abnormal water usage P Water not cleanP Motor shuts down while in use P GFCI shuts down frequentlyP Scale deposits P pH is too lowP Formation of chloramines P Foaming of waterOptional Purchase CIRCULATION PUMP OPERATIONSDATE WEEKLY MAINTENANCE SCHEDULEClean Maintenance920 Leathead Road Kelowna, BC V1X 2J8