Aquatic LuxeAir Series owner manual Structural Preparation, Factory installed tile flange

Page 8

INSTALLATION INSTRUCTIONS

STRUCTURAL PREPARATION (continued):

5.When placing the tub on a platform or cut out (see Diagrams), the opening should be 1” smaller than the specified rim dimensions. Extreme care must be taken in this type of installation to ensure the tub will come to rest entirely on the leveling feet or ABS Support Base.

6.IF YOU HAVE PURCHASED A WHIRLPOOL WITH AN INSTALLED TILE FLANGE, PROCEED TO INSTRUCTION “A”.

Factory installedtile flange:

SEE ILLUSTRATION 2A

A.Install the whirlpool bath unit per the instructions provided in this manual.

CAUTION: THE TILE FLANGE DOES NOT SUPPORT THE TUB! A ledger board must be provided under the bath rim as indicated in the installation instructions. Take care to ensure tub is not hanging from the ledger boards, as this will void your warranty.

B.Use nails or screws to secure the flange into the studs around the bath.

C.Install water resistant drywall against the tile flange and flush to the top of the whirlpool deck. Install the tile or other finishing materials. Apply a second bead of silicone between the first course of tile and the bath deck.

2A

NOTE: Before tub is used, the whirlpool system should be cleaned in accordance

with the procedures on Page 22 of this manual.

LuxeAir 31 & 32 - INTEGRALLYSKIRTED baths:

Alcove Framing and pre-InstallationProcedures:

1.Protect interior of tub throughout installation procedures.

2.Before moving unit into alcove see and follow enclosed Electrical Installation Procedures (electrical hookups will be difficult to perform if unit is installed first.)

IMPORTANT!Before installationbegins, make surethat:

1.Framed-in alcove is of proper size, square and plumb.

2.Walls and floors meet fire safety requirements of local building code and/or FHA/HUD Minimum Property Standards. Before installation of the panel, fill the unit, test the whirlpool system for proper operation and check for leaks, then drain.

3.A mortar base is prepared (this is mandatory for proper installation).

8

Aquatic Industries, Inc.

Image 8
Contents Iesluxeair SER Table of Contents Aquatic Industries, Inc Owner InformationAquatic Industries Customer Service Center CongratulationsRead and Follow ALL Instructions Installation Instruction Guidelines Installation Instructions Factory installed tile flange Alcove Framing and pre -Installation ProceduresIMPORTANT! Before installation begins, make sure that Structural PreparationInstallation Procedures for integrally skirted modelS Removable Skirt Panels for Integrally Skirted ModelSPlumbing Rough-In MeasurementsElectrical installation Heater Main Luxeair Block Diagram With Chromatherapy Option Operation of LuxeAir series LuxEAIR Series Whirlpool JetsFull Size Pressure-Flo Hydrotherapy Jet Aquatic Rotary Massage Jet11C Stress-Eaz Neck and Shoulder Jets some models11A 11B 12B 12C Inline maintenance heater operating instructionsFull Size Pressure-Flo Hydrotherapy Jets LuxeAir series Control Panel BATHside Control SystemsAir Bath Purge Cycle Automated dry Cycle11A Electronic Control Panel see Diagram 11AOperation LuxeAir with Optional Chromatherapy On/Off Control for Jets Pump Optional Chromatherapy LED lighting To Replace BulbAir bath system cleaning Maintenance and careWhirlpool system cleaning Water quality issues Chemical QualityTreatment Electrical Installation Information Listed on Whirlpool user informationFcc consumer information Serial Number LocationMicrobiological Quality Jet CleaningRepair Troubleshooting guide Symptoms Possible problems Suggested solutionsReplacement parts Order form For LuxEAir series How To UseQuantity Description PriceLuxeair Series Replacement Parts Order Map Assorted Fittings 10 a b11a 12a13a LuxeAir Bath Parts List 93ORBDWO Aquatic Industries, Inc. Limited Lifetime Warranty Page LAOM6 11/08