Alamo 6, 5 manual PRE-OPERATION Inspection and Service

Page 82
(SG-21)

OPERATION

OPERATION

5.PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be avoided. OPS-U-0029

Periodically inspect all moving parts for wear and replace when necessary with authorized service parts. Look for loose fasteners, worn or broken parts, and leaky or loose fittings. Make sure all pins have cotter pins and washers. Serious injury may occur from not maintaining this machine in good working order.

All Safety Shields, Guards and Safety devices including (but not limited to) - the Deflectors, Chain Guards, Steel Guards, Gearbox Shields, PTO integral shields, and Retractable Door Shields should be used and maintained in good working condition. All safety devices should be inspected carefully at least daily for missing or broken components. Missing, broken, or worn items must be replaced at once to reduce the possibility of injury or death from thrown objects, entanglement, or blade contact. (SGM-3)

SB5/6 03/09

Operation Section 3-8

© 2009 Alamo Group Inc.

Image 82
Contents Switchblade 5/6 To the Owner/Operator/Dealer Page Alamo Industrial Division is willing to provide Table of Contents Ledger Plates Safety Section Safety SB5/6 03/09 Safety Section Safety Safety Safety Safety S3PT-4 SBM-7 Safety See Your Alamo Dealer Safety QTY Type Description Peligro Decal Description Safety Instructions Safety Federal Laws and Regulations Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Introduction Section Introduction Introduction Before Operating this Machine Operation Section Operation Operation Operator RequirementsTractor Requirements Tractor Safety DevicesTractor Horsepower Tractor Requirements and CapabilitiesGetting on and OFF the Tractor Front End WeightPower Take Off PTO Tractor HydraulicsBoarding the Tractor Dismounting the TractorStarting the Tractor PRE-OPERATION Inspection and Service Tractor Pre-Operation Inspection/Service Sickle Bar Pre-Operation Inspection/ServiceFrame Assembly OPS-SB Hydraulic PUMP/OIL Reservoir Driving the Tractor and Implement Brake and Differential Lock Setting Starting the TractorDriving the Tractor and Switch Blade Operating the Tractor and Implement Motor Control Cutter BAR BREAK-BACK Operating the Switch Blade Shutting Down the Switch Blade Tractor and Switch Blade Storage Transporting the Tractor and ImplementTransporting on Public Roadways Operation Operation Hauling the Tractor and Implement Page Maintenance Section Maintenance Lubrication InformationInitial Hydraulic System Cleaning Reservoir OIL & Filter MaintenanceGuard Adjustment Cutterbar AdjustmentsCutterbar Alignment Wear Plate ClipsSB5/6 03/09 Maintenance Section Hydraulic System Pump & MotorCylinder Rod Maintenance Ledger PlatesPage ALAMO-INDUSTRIAL To the OWNER/OPERATOR/DEALER Switchblade 5/6 SOM 03/09