Alamo 02979718C manual Tractor Pre-Operation Inspection/Service

Page 89
(SG-20)

OPERATION

5.1 Tractor Pre-Operation Inspection/Service

Refer to the tractor operator’s manual to ensure a complete pre-operation inspection and scheduled service is performed according to the manufacturers recommendations. The following are some of the items that require daily service and inspection:

Tire condition/air pressure

Wheel lug bolts

Steering linkage

PTO shield

SMV sign is clean and visible

Tractor’s lights are clean and functional

Tractor Seat belt is in good condition

Tractor ROPS is in good condition

ROPS is in the raised position

No tractor oil leaks

Radiator free of debris

Engine oil level and condition

Engine coolant level and condition

Power brake fluid level

Power steering fluid level

Fuel condition and level

Sufficient lubrication at all lube points

Air filter condition OPS-U-0030

The operator’s manual and decals affixed on the unit contain important instructions on the safe and proper use of the equipment. Maintain these important safety features on the implement in good condition to ensure the information is available to the operator at all times.

Ensure the manual canister is secured to the equipment with the operator’s manual inside.

Ensure all decals are in place and legible. Replace missing, damaged, and illegible decals. OPS-U- 0011

Never attempt to lubricate, adjust, or remove material from the Implement while it is in motion or while tractor engine is running. Make sure the tractor engine is off before working on the Implement.

UGR 04/06

Operation Section 4-9

© 2006 Alamo Group Inc.

OPERATION

Image 89
Contents Under the Guardrail To the Owner/Operator/Dealer Page Alamo Industrial Division is willing to provide Table of Contents Page Safety Section Safety Safety Safety UGR 04/06 Safety Section Safety Safety Blade SBM-7 Safety STI-3 Decal Location QTY Type Description Reflect Safety Safety Safety Safety Federal Laws and Regulations Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Mounting on Bare Tractor Receiving InstructionsSee Figure Asm-R-0242 Assembly Control Cable Connection to Control Stick Assemblies Assembly Operation Section Operation Operator Requirements OperationTractor Horsepower Tractor Safety DevicesTractor Requirements Tractor Requirements and CapabilitiesBoarding the Tractor Getting on and OFF the TractorTractor Hydraulics Dismounting the Tractor Starting the Tractor PRE-OPERATION Inspection and ServiceOperation Tractor Pre-Operation Inspection/Service Driving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Do not Operate an Unsafe Tractor or Mower Rotary Mower PRE-OPERATION Inspection Operating the Tractor and Implement Mower Break Back Position ControlsMotor Control Tractor Mowing Speed Transporting on Public Roadways Transporting the Tractor and ImplementOperation Hauling the Tractor and Implement Operation Page Maintenance Section Lubrication Information MaintenanceReservoir OIL & Filter Maintenance Initial Hydraulic System CleaningMaintenance Pump & Motor Hydraulic SystemALAMO-INDUSTRIAL To the OWNER/OPERATOR/DEALER UGR- SOM-04/06 02979718C Printed U.S.A