1. Manuals
  2. Brands
  3. Computer Equipment
  4. Switch
  5. IBM
  6. Computer Equipment
  7. Switch

IBM 12.1(22)EA6 Configuring Layer 2 Trunk Failover

1 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 550
Download on canonical page 550 pages, 5.74 Mb
24-16
Cisco Systems IntelligentGigabit Ethernet Switch Modules for the IBMBladeCenter, Software Configuration Guide
24R9746
Chapter24 Configuring EtherChannels and Layer2 Trunk Failover
Configuring Layer 2 Trunk Failover
The link state of the downstream interfaces depend on the link state of the upstream interfaces in the
associated link-state group. If all of the upstream interfaces in a link-state group are in a link-down state,
then the associated downstream interfaces are forced into a link-down state. If any one of the upstream
interfaces in the link-state group is in a link-up state, the associated downstream interfaces are allowed
to change to, or remain in, a link-up state.
In Figure 24-4, downstream interfaces 1, 2, and 3 are in link-state group 1 with upstream interfaces 17
and 18. Similarly, downstream interfaces 4, 5, and 6 are in link-state group 2 with upstream interfaces
19 and 20.
If link is lost on upstream interface 17, the link state of downstream interfaces 1 to 3 do not change. If
upstream interface 18 also loses link, downstream interfaces 1 to 3 go into a link-down state.
Downstream interfaces 4 to 6 do not change state.
You can recover a downstream interface link-down condition by removing the failed downstream port
from the link-state group. You can also enable one of the upstream interfaces in the group to change to
the link-up state. To recover multiple downstream interfaces, disable the link-state group.
Figure24-4 Typical Layer 2 Trunk Failover Configuration
Configuring Layer 2 Trunk Failover
These sections describe how to configure trunk failover ports:
Default Layer 2 Trunk Failover Configuration, page 24-16
Layer 2 Trunk Failover Configuration Guidelines, page 24-17
Configuring Layer 2 Trunk Failover, page 24-17

Default Layer 2 Trunk Failover Configuration

There are no link-state groups defined, and trunk failover is not ena bled for any group.
BladeCenter For example
Catalyst 3550 Switch
92356
Downstream interface 1 Link-state group 1
Upstream interface 17
Upstream interface 18
Link-state group 2
Upstream interface 19
Upstream interface 20
Cisco
ESM
Downstream interface 2
Downstream interface 3
Downstream interface 4
Downstream interface 5
Downstream interface 6
Network
MENU

Models

Contents