Manuals
/
Brands
/
Household Appliance
/
Indoor Fireplace
/
Hampton Direct
/
Household Appliance
/
Indoor Fireplace
Hampton Direct
H25-LP1, H25-NG1 installation manual
Please, tick the box below to download manual:
Contents
Main
H25 Direct Vent Gas Fireplace
www.hampton- re.com
Owners & Installation Manual
Page
TABLE OF CONTENTS
SAFETY LABEL
REQUIREMENTS
INSTALLATION
OPERATING INSTRUCTIONS
SAFETY LABEL
COPY OF SAFETY LABEL FOR H25-NG1 & H25-LP1
Hampton H25-1 Direct Vent Freestanding Gas Stove 5
REQUIREMENTS
MA Code - CO Detector
(for the State of Massachusetts only)
IMPORTANT MESSAGE SAVE THESE
SPECIFICATIONS
INFORMATION FOR MOBILE / MANUFACTURED HOMES AFTER FIRST SALE
BEFORE YOU START
GENERAL SAFETY INFORMATION
INSTALLATION CHECKLIST
CLEARANCES TO COMBUSTIBLES
LOCATING YOUR GAS STOVE
MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS
COMBUSTION AND VENTILATION AIR
OPTIONAL FAN
Page
INSTALLATION PRECAUTIONS
VENTING INTRODUCTION
Note: These ue pipes must not be connected to any other appliance.
IMPORTANT
SAFETY PRECAUTIONS FOR THE INSTALLER
EXTERIOR VENT TERMINAL LOCATIONS
12 Hampton H25-1 Direct Vent Freestanding Gas Stove
FPI 946-506/P Vent Guard (Optional) 640-530/P Riser Vent Terminal
RIGID PIPE VENTING COMPONENTS LIST
RIGID PIPE VENTING SYSTEMS
Horizontal or Vertical Terminations
VENTING ARRANGEMENTS
Horizontal Venting with Two (2) 90o Elbows
H
Horizontal Venting with Two (2) 90o Elbows
H1 V
H1 H
V
H1
V
H
Vertical Venting with Two (2) 90o Elbows
V1 V H
VERTICAL TERMINATION WITH CO-LINEAR FLEX SYSTEM
Straight Vertical Terminations
Required Parts:
DV STOVE HORIZONTAL VENT KIT (#946-116 & #946-216) INSTALLATION
DV STOVE HORIZONTAL VENT KIT
Page
RESIDENTIAL AND MANUFACTURED HOMES / MOBILE HOMES MINIMUM HORIZONTAL TERMINATION INSTALLATIONS
Planning Your venting Installation
DURA-VENT TERMINATION KIT
Planning Your Dura-Vent Installation
DURA-VENT VENTING
Alternate Horizontal Termination Caps
HORIZONTAL TERMINATIONS
VERTICAL TERMINATIONS
Offset Chart
CONVERTING CLASS- A METAL CHIMNEY OR MASONRY CHIMNEY TO DIRECT VENT SYSTEM
Converting a Factory Built Metal Chimney
AERATION ADJUSTMENT
SYSTEM DATA - H25
Support Extensions - Round (RDSE) or Square (SQSE)
HIGH ELEVATION
GAS CONNECTION
GAS PIPE PRESSURE TESTING
Valve Description
CONVERSION KIT #434-969 FROM NG TO LP
THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER IF IN DOUBT DO NOT DO THIS CONVERSION !!
Each Kit contains one LPG Conversion Kit and one DC Sparker Kit.
Installation of the LPG Conversion Kit:
1) Shut off the gas supply.
Fig.3
Fig.4
Fig.6
LPG Configuration Red o-ring visible
Fig.5
Installation of the DC Sparker for the H25-1 Unit Only:
D)
LOG SET INSTALLATION
Page
REMOTE CONTROL
WALL THERMOSTAT
DECORATIVE DOOR GRILL INSTALLATION
WIRING DIAGRAMS
FINAL CHECK
For NATURAL GAS Units and Units NOT Equipped with DC Spark Boxes
For PROPANE Units and Units Equipped with DC Spark Boxes*
*For installation of the DC Spark Box refer to the LP Conversion instructions in this manual.
AUTOMATIC CONVECTION FAN OPERATION
ADJUSTING FLAME HEIGHT
OPERATING INSTRUCTIONS
OPERATING
DO NOT BURN THE APPLIANCE WITHOUT THE GLASS FRONT IN PLACE.
SHUTDOWN PROCEDURE
FIRST FIRE
OPERATING INSTRUCTIONS
FOR UNITS NOT EQUIPPED WITH ELECTRIC SPARK:
TO TURN OFF GAS APPLIANCE
DO NOT REMOVE THIS INSTRUCTION PLATE
FOR YOUR SAFETY READ BEFORE LIGHTING
MAINTENANCE
NORMAL OPERATING SOUNDS OF GAS APPLIANCES
To Remove Fan:
FAN MAINTENANCE
Disconnect power supply before servicing
GENERAL VENT MAINTENANCE
LOG REPLACEMENT
GLASS REPLACEMENT
REMOVING VALVE
INSTALLING VALVE ASSEMBLY
Replacing the Fan:
PARTS LIST
MAIN ASSEMBLY
BURNER & LOG ASSEMBLY
WARRANTY