Manuals
/
Brands
/
Household Appliance
/
Boiler
/
Raypak
/
Household Appliance
/
Boiler
Raypak
751 manual
Please, tick the box below to download manual:
Contents
Main
INSTALLATION AND OPERATING INSTRUCTIONS
Models
1501 Types H, WH & P
Advanced Design Boiler
L W
Page
CONTENTS
WARNINGS
Pay Attention to These Terms
BEFORE INSTALLATION
Product Receipt
Model Identification
Ratings and Certifications
Installations at Elevation
Page
GENERAL SAFETY
Time/Temperature Relationships in Scalds
Equipment Base
Clearances
Indoor Installations
INSTALLATION INSTALLATION
Installation Codes
Adjustment Screw
Outdoor Installations
Combustion and Ventilation Air
Indoor Units
Direct Vent
Page
Conventional Combustion Air Supply
U.S. Installations
Canadian Installations
WATER PIPING
General
Relief Valve Piping Hydrostatic Test
Low Temperature System
Temperature & Pressure Gauge
HYDRONIC HEATING
Pump Selection
Pressure Drop in Feet of Head Feedwater Regulator
Piping Heating Boilers
Air-Separation/Expansion Tank
Page
Page
Page
Page
Page
POOL HEATING
Automatic Chlorinators and Chemical Feeders
Pool and Spa Water Chemistry
Winterizing Your Heater
Page
GAS SUPPLY
Gas Supply Connection
Gas Supply Pressure
Gas Pressure Regulator
Venting of Diaphragm Gas Components
ELECTRICAL POWER
Surge Protection
Check the Power Source
Making the Electrical Connections
Electrical Connections Domestic Hot Water
VENTING
General
Definition of Appliance Categories
Determination of Appliance Category for Venting Purposes and Venting Arrangements
Support of Vent Stack
Vent Terminal Location
U.S. Installations
Canadian Installations
Venting Installation Tips
Venting Configurations
Page
Natural Draft Vertical Venting System Installation
Natural Draft Vertical Vent
Page
System (Category III) Installation
Horizontal Thru-wall Direct Vent
System (Category III) Installation
Horizontal Thru-wall Direct Vent
Page
Vertical Direct Venting System
Vertical Direct Vent Termination
Vertical Vent (Category IV) with Add-on Condensing Heat Exchanger
Horizontal Thru-wall Venting System (Category IV) Installation
Page
System with Add-on Condensing Heat Exchanger (Category IV)
Vertical Direct Venting System With Add-on Condensing Heat Exchanger (Category IV) Installation
Outdoor Installation with Add-On Condensing Heat Exchanger
CONDENSATE DRAIN
CONTR OLS
The CPW Board
Pump Turn-off Delay
Blower Fan Pre-purge
Blower Fan Post-purge
Freeze Protection Feature
U-2 Diagnostics Board
Page
Ignition Control Module
High Limit Manual Reset
Flow Switch
High Limit Auto Reset
Low Water Cut Off (Optional)
PRE-START-UP
Fill the System:
Inspect Venting System:
For Your Safety Read Before Lighting
Pre-Start-up Check
ADB INITIAL START-UP
Tools Needed
Preparation for Start-up
Check Power Supply
Attach Manometers to Measure Pressures (See Fig. 37)
Page
Main Burner Adjustment
Safety Inspection
Follow-up
POST START-UP CHECK
OPERATION
Operating Instructions
To Turn Off Gas to Appliance
MAINTENANCE
Suggested Minimum Maintenance Schedule:
CONNECTING THE CONDENSING HEAT EXCHANGER (CHX)
Vent Switch Adjustment:
APPENDIX
Inside Combustion Air Contamination:
START-UP CHECKLIST FOR FAN-ASSISTED RAYPAK PRODUCTS ADB, HI-DELTA & MV B
VISUAL INSPECTION OF COMPONENTS
VEN TING
EMISSIONS SETTINGS AND TEST INFORMATION (AT FULL FIRE)
Nominal Factory Recommended Settings