10.Connect the flue vent (Category IV venting, UL 1738 Certified Venting Material) to the 15° elbow of the CHX flue outlet.
11.Connect the PVC pipe (not supplied) for conden- sate water disposal (check with local authority regarding condensate disposal).
12.Replace the shroud.
13.Allow the silicone (RTV) to cure
Vent Switch Adjustment:
In order to ensure proper operation of the ADB boiler with a CHX attached to it, the vent switch must be adjusted to proper setting. The vent switch is located on the
•Turn power off; disconnect the electrical wiring and the rubber hose.
•Remove the switch (it has a black plastic orifice at the hose connection).
•On the backside, remove the (purple) seal from atop the adjusting screw.
•Turn the plastic hex screw
•Seal with silicone.
•Reinstall in reverse order.
Table W: CHX Rate of Flow and Pressure Drop
Fig. 39: Connecting
53