ADB INITIAL START-UP

CAUTION: Verify that the vent system and combustion air supply have been approved.

Turn Off The 1 1/2” Manual Gas Valve; Turn Off Pilot Gas Valve;

Reset Low Gas Pressure Cut-off Switch;

Bleed Air from Gas Line

Tools Needed

One 8-0-8 , 16” scale manometer (or larger)

Four 4-0-4, 8” scale manometers (or larger)

“T” fitting

7/16” and 1/2" open end wrenches

Small and large flat-head screwdrivers

Volt meter

Amp probe

Elec. Dual reading thermometer with strap on sen- sors

3/16” Allen wrench

Combustion analyzer

Preparation for Start-up

WARNING: DO NOT TURN ON GAS AT THIS TIME.

Check Power Supply

With voltmeter at incoming power check voltage between:

Hot - Common (»120 VAC)

Hot – Ground (»120 VAC)

Common - Ground (< 1 VAC)

If Common - Ground is > 1 VAC - STOP: Contact elec- trician to correct ground failure.

WARNING: Failure to do this may burn out 120V- 24V transformer, or may cause other safety control damage or failure.

Attach Manometers to Measure Pressures (See Fig. 37)

Attach 16" scale manometer to the first gas shut- off valve pressure tapping, Location (1)

Attach one 8" scale manometer to each manual gas valve pressure tapping, Locations (2) and (3).

Attach one 8" scale manometer to the outlet side of pilot gas valve pressure tapping, Location (4).

Attach one 8" manometer to “T” fitting, air pressure switch, and aluminum tubing, Location (5).

CAUTION: Make sure there is no ignition source in the boiler room.

With power off, slightly open union outside the cabinet to bleed air.

Close union when you smell gas.

Wait minimum 5 minutes to clear the gas out of the boiler room before continuing.

Check the Gas Supply Pressure, Location (1)

Leave pilot gas valve and first manual gas valve closed;

Slowly turn on main gas shut-off valve (outside the unit);

Read the gas supply pressure from the manome- ter (Location 1);

If pressure is > 14" W.C., Turn off the valve;

Check if the service regulator is installed and/or adjust the service regulator.

START-UP

NOTE: Reference the start-up pressures settings located on the side of the control box.

Blower Adjustment

1.Main gas shut-off valve is still closed;

2.Turn power on;

3.Check blower manometer reading, Location (5). Compare your reading to the “Pre-Fire” values shown in tables T and U. If not, adjust the air shut- ter on the blower to attain the correct value;

4.Turn power off.

Pilot Adjustment

1.Turn on the gas shut-off valve, the main gas man- ual valve, and the pilot manual valve;

2.Turn off the manual gas valves at Locations (2) and (3);

3.Turn power on, after 40-45 seconds, ignition con- trol will energize and send spark to ignition, observe through view port for spark;

4.If you do not see spark, turn off power, check igni-

48

Page 48
Image 48
Raypak 751 manual ADB Initial START-UP, Tools Needed, Preparation for Start-up

751 specifications

The Raypak 751 is a high-efficiency, gas-powered pool and spa heater renowned for its advanced technology and durability. Designed with innovative features, the Raypak 751 prioritizes user convenience and energy efficiency, making it an excellent choice for pool owners seeking reliable heating solutions.

One of the standout features of the Raypak 751 is its robust heat exchanger, built from the finest materials to ensure long-lasting performance. This model utilizes a copper heat exchanger which is highly conductive, allowing for rapid heating of water and maintenance of consistent temperatures. Its design also minimizes scale buildup, extending the longevity of the heater.

The Raypak 751 is equipped with advanced digital controls that make it user-friendly. The intuitive interface allows for precise temperature settings and monitoring, ensuring optimal performance. Additionally, the heater features a temperature display that provides real-time updates, giving users peace of mind when adjusting their pool's environment.

Energy efficiency is a hallmark of the Raypak 751, thanks to its low NOx burner technology. This feature meets stringent environmental regulations while also lowering operational costs. By optimizing fuel usage, the heater not only contributes to reducing greenhouse gas emissions but also provides a more economical heating option for pool and spa owners.

The rugged construction of the Raypak 751 is another characteristic that sets it apart. Its heavy-duty cabinet is designed to withstand the elements, ensuring reliable operation in various weather conditions. The heater is available in multiple configurations, including both natural gas and propane options, allowing for flexible installation depending on the user's needs.

Furthermore, the Raypak 751 incorporates safety features, such as an integrated pressure switch that prevents operation when water flow is insufficient. This protects both the heater and associated plumbing from damage due to overheating or dry firing.

In summary, the Raypak 751 combines cutting-edge technology with user-centric features to deliver a superior pool heating experience. Its high-efficiency performance, durable construction, and advanced safety features make it a top choice for anyone looking to enhance their pool or spa. Whether for residential or commercial applications, the Raypak 751 ensures warmth and comfort, enriching the overall swimming experience.