System Grounding Requirements

Damage from Electromagnetic Static Discharge (ESD) can occur when electronic components are improperly handled. Its results can be complete or intermittent system failures. Therefore, proper ESD protection is required whenever you handle IPS devices and equipment. It is not necessary to open the UnityOne ZPHA chassis to add or remove any components.

Note: When you install the ZPHA, you do not need to modify or open the IPS chassis. You will only need to connect cables during installation procedures.

Cabling Requirements

The UnityOne ZPHA requires the following cables:

USB cable — 1 cable for connecting to the IPS to receive power (included with device)

RJ-45 copper network cables — 4 cables are required per segment:2 for IPS connections and 2 for network connections. (cables not included)

LC-LC Simplex Multi-mode Fiber cables — 4 per segment (included with device). Additionally, you should have 4 cables currently with your IPS device to connect to the ZPHA and/or Ethernet switch.

Note: For Simplex Single-mode Fiber cables, contact a TippingPoint Sales

Representative.

Unpack the UnityOne ZPHA

Each system chassis is securely packaged in a shipping box.

CAUTION: ESD can damage the UnityOne if you do not take necessary precautions. Installation and maintenance personnel should be properly grounded using ground straps to eliminate the risk of ESD damage to the equipment.

Use caution when opening the UnityOne boxes.

To unpack the ZPHA system, complete the following steps:

STEP 1

STEP 2

STEP 3

STEP 4

Inspect the packing container. If you see any damage or other signs of mishandling, inform both the local freight provider and TippingPoint before unpacking. Your freight provider can provide you with the procedures necessary to file a claim for damages.

Carefully open the box.

Remove all packing material.

Verify the contents in the shipping package. Compare the packing list to your shipment and to your order. Are all items included? If items are missing, contact your TippingPoint sales or field representative.

UnityOne Modular Fiber/Copper ZPHA Installation Guide V 2.1