Before You Configure ATM 37
Before You Configure ATM
Before you configure ATM, follow these steps:
Check the ATM link status.
Verify that address registration is operational.
Verify that signalling is operational.
Checking
ATM Link Status
To check the link status, follow these steps:
1From the top level of the Administration Conso le, enter:
atm ume display
You are prompted for the number(s) of the UME that you want to display.
2Enter the number(s) of the UME(s) or all.
Sample ATM UME display:
The state field should show connected. If the state field shows
disconnected, there is a problem with the link. If this happens, check
the cabling to ensure that the CoreBuilder 2500 system is correctly
connected to the ATM switch.
reqState state reqVpi
connected connected 0
vpi reqVci vci
0 16 16
connCount discCount rxPdus
2 2 232
dropRxPdus txPdus
0 209