7-INSTALLATION AND OPERATION (continued)
2.The operator moves the side guides in against the box to center it on the conveyor rollers and tightens the four hand knobs to secure the side guides. See Figure
Additional boxes, ready for the tape sealing application, are moved in to flood the conveyor behind the lead box.
3.The operator rotates the electrical switch to "On" to start the powered box rollers.
4.The operator moves the lead box forward onto the powered box rollers. The box moves over the center cam that activates the timer causing the
5.The lead box moves through the case sealer taping application. The timer on the infeed conveyor has been set to raise the
Note – Roller drive motor is designed to run at a moderate temperature of 40° C [104° F]. In some cases, it may feel warm to the touch.
Figure 7-8 – Side Guide Setup
Side Guides
21 | 2011 June |