TABLE OF CONTENTS (continued)

6. Unpacking

 

 

6.1

Uncrating

16

 

6.2

Packaging Materials Disposal

16

7.

Installation and Operation

 

 

7.1

Operating Conditions

17

 

7.2

Space Requirements for Machine Operation and Maintenance

17

 

7.3

Machine Positioning / Bed Height

17

 

7.4

Preliminary Electric Inspection

18

 

7.5

Main Power Machine Connection and Inspection

18

 

7.6

Pneumatic Connection

18 - 19

 

7.7

Infeed Conveyor Assembly

19 - 21

8.

Maintenance

 

 

8.1

Safety Measures (see section 3)

22

 

8.2

Tools and Spare Parts Supplied with Machine

22

 

8.3

Maintenance Operations - Recommended Inspections and Frequency

22

 

8.4

Inspections to be Performed Before and After Every Maintenance Operation

22

 

8.5

Safety Features (Inspection Efficiency)

22

 

8.6

Machine Cleaning

23

 

8.7

Lubrication

23

 

8.8

Lubrication Products

23

 

8.9

Maintenance Work Log

24

9. Additional Instructions

 

 

9.1

Machine Disposal Information

25

 

9.2

Emergency Procedures

25

10.Special Information

10.1

Statement of Conformity

25

 

10.2

Hazardous Substances Emission

25

 

11. Technical Documentation and Information

 

 

11.1

Pneumatic Diagrams

26

 

11.2

Electric Diagrams

27

 

11.3

Spare Parts / Ordering

28

- 29

Drawings and Parts Lists

31

- End of Manual

a80f-if-NA

iii

2011 June

Page 7
Image 7
3M 11000 Table of Contents Unpacking, Installation and Operation, Maintenance, Additional Instructions