AC International 8200 Series ANSI/OSHA Coupler Guard REMOVAL/INSTALLATION, Removal, Installation

Models: 8200 Series

1 36
Download 36 pages 2.74 Kb
Page 9
Image 9

vibration, and bearing loads that result in premature bearing failure and ultimate seizing of the pump. Misalignment can be angular, parallel, or a combination of these, and in the horizontal and vertical planes. Final alignment should be made by moving and shimming the motor on the base plate, until the coupling hubs are within the recommended tolerances measured in total run-out. All measurements should be taken with the pump and motor foot bolts tightened. The shaft of sleeve bearing motors should be in the center of its mechanical float.

NOTE: Proper alignment is essential for correct pump operation. This should be performed after base plate has been properly set and grout has dried thoroughly according to instructions. Final alignment should be made by shimming driver only. Alignment should be made at operating temperatures.

WARNING: Unexpected Start-up Hazard

Disconnect and lock out power before servicing. Failure to follow these instructions could result in serious personal injury or death and property damage.

ANSI/OSHA COUPLER GUARD

REMOVAL/INSTALLATION

WARNING: Unexpected Start-up Hazard

Disconnect and lock out power before servicing. Failure to follow these instructions could result in serious personal injury or death and property damage.

NOTE: Do not spread the inner and outer guards more than necessary for guard removal or installation. Over spreading the guards may alter their fit and appearance.

Removal

a.Remove the two capscrews that hold the outer (motor side) coupler guard to the support bracket(s).

b.Spread the outer guard and pull it off the inner guard.

c.Remove the capscrew that holds the inner guard to the support bracket.

d.Spread the inner guard and pull it over the coupler.

Installation

a.Check coupler alignment before proceeding. Correct if necessary.

b.Spread the inner guard and place it over the coupler.

c.With the inner guard straddling the support bracket, install a capscrew through the hole (or slot) in the support bracket and guard located closest to the pump. Do not tighten the capscrew.

d.Spread the outer guard and place it over the inner guard.

e.Install the outer guard capscrews by following the step stated below which pertains to your particular pump:

i.For pumps with a motor saddle support bracket: Ensure the outer guard is straddling the support arm, and install but do not tighten the two remaining capscrews.

ii.For pumps without a motor saddle support bracket: Insert the spacer washer between the holes located closest to the motor in the outer guard, and install, but do not tighten, the two remaining capscrews.

f.Position the outer guard so it is centered around the shaft, and so there is less than a 1/4" of the motor shaft exposed. On guards that utilize a slotted support bracket, the inner guard will have to be positioned so there is only a 1/4" of the pump shaft exposed.

g.Holding the guard in this position, tighten the three capscrews.

9

Page 9
Image 9
AC International 8200 Series instruction manual ANSI/OSHA Coupler Guard REMOVAL/INSTALLATION, Removal, Installation

8200 Series specifications

The AC International 8200 Series represents a cutting-edge advancement in the realm of commercial and industrial automation. Tailored for efficiency and flexibility, this series is designed to meet the rigorous demands of modern applications across various sectors such as manufacturing, logistics, and energy management.

One of the standout features of the AC International 8200 Series is its robust control system. Equipped with an advanced microprocessor, the system ensures high performance, enabling real-time data processing and decision-making. This feature enhances the capability of users to manage complex operations while maintaining optimal productivity levels.

The 8200 Series integrates seamlessly with the latest communication protocols, such as Ethernet/IP and Modbus, allowing for smooth integration into existing infrastructures. This interoperability ensures that organizations can adopt the new series without incurring significant costs associated with overhauling their current systems.

Energy efficiency is another key characteristic of the 8200 Series. It incorporates a variety of smart technologies, including power monitoring and energy-saving modes, which help organizations reduce their operational costs and environmental footprint. These features are especially beneficial in industries where energy consumption is a significant concern.

In terms of user interface, the AC International 8200 Series offers a customizable touchscreen display that provides operators with real-time insights into their systems. This user-friendly interface facilitates quick troubleshooting and comprehensive monitoring, thereby promoting operational efficiency.

Furthermore, the series boasts enhanced safety features, including emergency stop functions and overload protection mechanisms. These safety characteristics are critical in environments where machinery operates at high capacities, ensuring the well-being of personnel and minimizing risks associated with operational failure.

With its modular design, the 8200 Series allows for easy scalability. This means that businesses can expand their systems according to growth and evolving demands without compromising performance or requiring extensive modifications.

Finally, AC International backs the 8200 Series with unparalleled customer support and comprehensive training resources, ensuring that businesses can fully harness the potential of their investments. As industries continue to evolve and embrace digital transformation, the AC International 8200 Series stands out as an essential solution for those looking to improve efficiency, safety, and sustainability in their operations.